Appendix
Uni Condens 8000 F – 6720867056 (2016/10)
44
Table 22 Heating system maintenance protocol
Demand-based maintenance
Page (individual steps)
Remarks
1.
Shutting down the heating system.
2.
Clean the combustion chamber.
3.
Clean the hot gas flues (heating surfaces)
4.
Check and, if required, replace gaskets and packing cords
at:
• Burner door
• Inspection aperture of reversing chamber
• Inspection aperture of flue gas collector
Tighten screw connections at the reversing chamber and
flue gas collector to the specified torque and check
tightness.
5.
Check that the condensate pipe is clean and filled with a
water seal.
6.
Check the neutralising system.
See technical documents of the
condensate neutraliser
7.
Bring the heating system into operation.
8.
Final check of the maintenance work, take measurements
and record values and test results.
See technical documentation for
burner.
9.
Check the function and operational safety
(safety equipment).
10. Confirm professional commissioning.
Company stamp/signature/date
Содержание Uni Condens 8000 F
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ...Bosch Thermotechnik GmbH Junkersstrasse 20 24 D 73249 Wernau www bosch thermotechnology com ...