12. Place the cover and fasten it using the four screws on the housing of the
VPP 21 box.
13. Implement the VPP 21 box again by introducing it into the plastic housing
from the right. The two flaps on the left (below the left door) have to slide
into the corresponding holders. Fix the two fastening screws on the right ,
the two ribbon cables on the left and the remaining cables on the connector
panel and close the doors.
If the card is equipped with a Plug and Play (PnP) function, it is automatically
recognized by the operating system and integrated in the system, provided that
no hardware conflicts (IRQ etc.) exists.
In the event that after a system reboot the functions based on the new card are
not available, there may be several reasons:
●
The card is not properly seated in the PCI slot.
●
The driver software of the card has not been installed or its installation is
faulty.
●
IRQ (Interrupt) conflict with other PC hardware components.
●
The software of the card has not been installed.
58/65
Bosch Rexroth AG | Electric Drives
and Controls
Rexroth IndraControl VPP 21.2 | Project Planning Manual
Maintenance and Installation
Содержание Rexroth IndraControl VPP 21.2
Страница 7: ...Bosch Rexroth AG Electric Drives and Controls Rexroth IndraControl VPP 21 2 Project Planning Manual ...
Страница 11: ...Bosch Rexroth AG Electric Drives and Controls Rexroth IndraControl VPP 21 2 Project Planning Manual ...
Страница 31: ...Bosch Rexroth AG Electric Drives and Controls Rexroth IndraControl VPP 21 2 Project Planning Manual ...
Страница 45: ...Bosch Rexroth AG Electric Drives and Controls Rexroth IndraControl VPP 21 2 Project Planning Manual ...
Страница 71: ...Bosch Rexroth AG Electric Drives and Controls Rexroth IndraControl VPP 21 2 Project Planning Manual ...
Страница 73: ...Bosch Rexroth AG Electric Drives and Controls Rexroth IndraControl VPP 21 2 Project Planning Manual ...
Страница 74: ...Notes Project Planning Manual Rexroth IndraControl VPP 21 2 Electric Drives and Controls Bosch Rexroth AG ...