Start-up 31/56
3 842 558 372/2021-10, MIT: EL 2,
Bosch Rexroth AG
Life stages of the machine according to EN 12100 Sect. 5.4 a/b (No. 1- 27), Sect. 5.4 a
1
Transport, assembly and installation
2
Commissioning
3
Use
4
Dismantling, decommissioning and disposal
5
Set up
6
Testing
7
Teaching/programming
8
Changeover
9
Startup
10
All operating modes
11
Feeding the machine
12
Removing product from the machine
13
Shutting the machine down
14
Shutting the machine down in the case of an emergency
15
Restoring operation after a bottleneck or blockage
16
Restarting after unscheduled shutdown
17
Troubleshooting and remedial action (intervention by operating personnel)
18
Cleaning and keeping clean
19
Preventive maintenance
20
Corrective maintenance
Operating states of the machine, Sect. 5.4 b
21
Normal operation
22
Modifi cation of a property or a dimension of the material or workpiece to be processed
23
Failure of one (or more) of its parts or supply devices
24
External disturbances (e.g. impact, vibration, electromagnetic interference0)
25
Design faults or defects (e.g. software errors)
26
Disruption in the power supply
27
Environmental conditions (e.g. damaged fl oors)
EN
GLISH