40/84 Assembly
Bosch Rexroth AG
, MIT: HQ 2/G-H, BS 2/G-250, 3 842 564 989/2022-06
Fig. 23:
564 988-41
D8
D8
D8
D8
5
3
4
2
1
HQ,
pneumatic
circuit diagram
Please note:
Approaching the central
position:
Lower to the bottom
position.
Then depressurize
the valve (= middle
switching position).
Built-in springs lift the
HQ... to the central
position.