Inspection and maintenance
Gaz 6000 W – 6720866247 (2019/07)
34
15
Inspection and maintenance
15.1
Safety instructions for inspection and maintenance
H
Notes for the target group
Only approved contractors may carry out inspection
and maintenance. The manufacturer's maintenance
instructions must be observed. Failure to comply with
instructions may result in material damage and
personal injury, including possible loss of life.
▶ Inform the user of the consequences of insufficient
or non-existent inspection and maintenance.
▶ Have the heating system inspected at least once a
year, and have any required maintenance or
cleaning work carried out.
▶ Remedy all faults immediately.
▶ Check the heat exchanger at least every 2 years,
and if necessary clean it. We recommend an annual
inspection.
▶ Use only original spare parts (see the spare parts
catalogue).
▶ Replace removed gaskets and O-rings with new
ones.
H
Danger to life through electric shock!
Touching live parts can result in an electric shock.
▶ Before carrying out work on electrical components,
isolate them from the power supply (230 V AC)
(fuse, circuit breaker) and secure against
unintentional reconnection.
H
Risk of death from escaping flue gas!
Escaping flue gas can cause poisoning.
▶ Check for leaks after working on flue gas-carrying
components.
H
Risk of explosion from escaping gas!
Escaping gas can cause an explosion.
▶ Close the gas isolator prior to working on gas-
carrying components.
▶ Carry out tightness test.
H
Risk of scalding from hot water!
Hot water can lead to severe scalding.
▶ Make residents aware of the risk of scalding prior to
activating the chimney sweep mode or a thermal
disinfection.
▶ Carry out thermal disinfection outside the normal
hours of use.
▶ Do not change the maximum domestic hot water
temperature set.
H
Escaping water can damage the device.
The control device can be damaged by escaping water.
▶ Cover the control device prior to work on parts
routing water.
H
Resources for inspection and maintenance
• The following measuring devices are required:
– Electronic flue gas analyser for CO
2
, O
2
, CO and
flue gas temperature
– Pressure gauge 0 - 30 mbar (minimum resolution
0.1 mbar)
▶ Use heat conducting paste 8 719 918 658 0.
▶ Use approved greases.
H
After the inspection/maintenance
▶ Re-tighten all the threaded connections that have
been released.
▶ Restart the appliance (
chapter 7, page 22).
▶ Check all joints for leaks.
▶ Check the gas/air ratio.
Содержание Gaz 6000 W
Страница 50: ......
Страница 51: ......
Страница 52: ...Bosch Thermotechnik GmbH Junkersstrasse 20 24 D 73249 Wernau www bosch thermotechnology com ...