- 4 -
INITIAL PREPARATIONS
•
Determine the operating voltage at the
installation site. The camera‘s Voltage Regulator
Board accepts 12-24V AC/DC input without
change to internal connections.
•
Determine the optimum mounting location for the
camera.
S
ee
Section 4, Camera Mounting.
•
All cameras have been tested and pre-focused
with telephoto setting as factory default prior to
shipment. If any adjustment needed, it is
advisable to check the camera’s operation before
installation.
GUIDELINES
The installation of the
EX85
is shown in Sections 1 to 13.
It is important that these steps are followed in numerical
order.
It is also important to follow proper safety guidelines when
installing this product.
Содержание EX85
Страница 1: ...INSTALLATION INSTRUCTIONS EX85 MEGAPIXEL IP INFRARED IMAGER MAN 85 02 ...
Страница 33: ... 27 Single Capture option halts camera from sending images unless externally triggered from software ...
Страница 35: ... 29 Image Quality Adjustment Window ...
Страница 44: ... 38 Default Camera Settings ...
Страница 50: ... 44 16 MOUNTING HOLES DIAGRAM All dimensions expressed in millimeters 1 59 X 3 38 in inches ...