Information for heating contractor
CR 10 H – 6720876740 (2017/08)
26
A reset restores the default setting. In the event of a power failure, the settings
including the heating circuit allocation are retained.
L.1
1
| 0
Optimised running of the pump: in the case of
flow temperature control, the heating pump
runs as briefly as possible. Switch off, if there
is a buffer cylinder in the system.
C.1
C
| F
Unit of displayed temperature °C (C) or °F (F)
S.1
nF.12.01
Software version
3)
F.1
1 |
0
Resetting CR 10 H
0: Do not reset
1: Reset
U.2
0 ... 999
Nominal flow rate m
3
/h
U.3
3 ...
6
... 12
Filter runtime in months
U.4
1 |
0
Bypass installed
1: Yes
0: No
U.5
1 |
2
| 3
Frost protection
1: Interval
2: Disbalance
4)
3: Electric pre-heater bank
U.6
30 ...
60
... 120
Sleep mode duration in minutes
U.7
10 ...
15
... 60
Intensive ventilation duration in minutes
1)
Highlighted values
= Default setting
2) Only one CR 10 H must be allocated to each heating circuit.
3) Turn the selector to read out the whole value.
4) Certified by the German Institute for Building Technology (DIBT)
Setting
Adjustment
range
1)
Description
Содержание CR 10H
Страница 109: ...109 CR 10 H 6720876740 2017 08 1 2 1000 1200 750 600 C F 6 720 647 292 03 1O 500 1 2 3 0010006146 001 ...
Страница 110: ...CR 10 H 6720876740 2017 08 110 3 4 0010002900 002 6 mm 3 5 mm 6 mm 3 5 mm C F 0010016251 001 BUS EMS BB BUS ...
Страница 111: ......
Страница 112: ...Bosch Thermotechnik GmbH Junkersstrasse 20 24 D 73249 Wernau www bosch thermotechnology com ...