92
en | Maintenance and troubleshooting
Conettix Universal Dual Path Communicator
2017.11 | 05 | F.01U.311.207
Installation and Operation Manual
Bosch Security Systems, Inc.
3.
Click the port that has the B465 Dual Path Communicator option.
4.
Click Ok.
5.
Press the Enter key and login.
11.7
Testing the system
Test the system completely after installing and programming the B465. Test the B465, the
control panel and all devices once a week for proper operation.
Notice!
After system installation and any B465 programming, perform a complete system test (UL 864
requirement). A complete system test includes testing the control panel, B465,all devices,
and communication paths for proper operation.
Содержание B465
Страница 1: ...Conettix Universal Dual Path Communicator B465 en Installation and Operation Manual ...
Страница 2: ......
Страница 114: ......