EN
17
Installation
www.bora.com
1
2
3
4
6
5
Fig. 5.9
Control box structure
[1]
Control box
[2]
Adjustment plates
[3]
Fixed front panel (not included in scope of delivery)
[4]
Power level sleeve
[5]
Nuts
[6]
Control knobs
X
X
Draw the bore holes accordingly with the aid of the
drilling template provided.
1
2
90
5
5
>105
37
Ø6
Ø30
Fig. 5.10 Drilling template
[1]
Worktop
[2]
Fixed front panel
X
X
Pre-drill the bore holes to prevent tearing out the fixed
front panel.
Determine the number of adjustment plates
Q
Q
The total dimensions of the adjustment plates [2] and
the fixed front panel [3] should be 36 mm.
Q
Q
The total dimensions of 36 mm must be adhered to
in order to ensure that the control box [1] functions
smoothly.
5.5 Installing the cooktop
INFO
A gap of one millimetre should be planned
between the built-in appliances.
INFO
A gap of two millimetres should be planned
around the built-in appliances.
INFO
The mounting rail supplied with the cooktop
should be installed between the cooktops as
well as between the cooktops and the cooktop
extractor.
INFO
Cable protection (a false floor) should be
mounted below the appliance. This needs to be
removable for maintenance work.
>
20
100
7
Fig. 5.7
Side view of the cable protection and ventilation
Q
Q
Cross bars on the kitchen unit in the area of the
worktop cut-out may need to be removed.
Q
Q
The drawers and/or shelves in the floor unit must be
removable for maintenance and cleaning purposes.
Q
Q
Make sure that the area below the cooktop is sufficiently
ventilated. An opening cross-section > 50 cm
2
at the
front side and in the false floor for the ventilation of
the induction equipment should be available.
5.5.1 Installing the control box behind the
floor unit fixed front panel
Fig. 5.8
Installed control box and cooktop
Содержание PI11
Страница 27: ......