background image

18

19

Maintenance

We advise that the below is carried out annually as failure to do so may result in 

invalidation of warranty.
Shut off the water supply to both hot and cold inlets, before commencing any 

maintenance work below.

Fig. 1

Fig. 2

Fig. 3

Handle

Screw 

cover

Lock 

washer

Screw

Spring 

washer

Shroud

Temperature 

ring

Securing nut

Stop ring

Cartridge

Step

Locating slot

Spacer ring

Indicator

Thermostatic cartridge

To clean the filters, you must first remove 
the cartridge from the housing.

Removing the Cartridge
1.

 Shut off the water supply to both inlets.

Ensure the thermostatic valve has been 
successfully isolated.

2.

 Using a suitably flat tool remove the 

screw cover, unscrew and remove the 
temperature handle and pull off the shroud 
and spacer ring 

(fig 1)

. Remove the ceramic/

chrome temperature ring allowing access to 
the valve 

(fig 2)

.

3.

 Using pliers if required gently remove 

temperature stop ring (essential) 

(fig 2)

.

4.

 Turn shower on to check isolation, please 

ensure that your body/hands are not under 
the flow of water as there is a potential for 
delivery of hot water.

5.

 Using a 32mm box spanner unscrew and 

remove the valve securing nut then carefully 
pull out the thermostatic cartridge 

(fig 3)

.

Note:

 Ensure care is taken as a small 

amount of residual water may escape when 
removing the cartridge.

Fig. 5

Fig. 4

Maintenance

6. 

Clean the cartridge filters by rinsing 

them under running water to remove any 
debris.

7.

 If there is limescale deposits then it is 

recommended to immerse the cartridge 
for a few minutes in 50% white vinegar 
+ 50% hot water, brush the filters gently 
and then rinse under running water to 
clean all particles. If this is not effective, a 
replacement cartridge should be fitted.

8.

 Before reassembling the cartridge, 

clean its housing with a wet cloth and 
grease the O-rings using a suitable 
silicone grease. Insert the thermostatic 
cartridge into the body aligning the slot in 
the body with the grub screw 

(fig 4)

.

9.

 Screw the securing nut on and tighten 

using a box spanner, careful not to 
overtighten.

10.

 Replace the temperature stop ring on 

the cartridge with the cold step located at 
7 o’clock 

(fig 5)

.

11.

 Turn the water supply on.

12.

 Check the water temperature to 

ensure correct commissioning. See 
previous section.

13.

 Replace the ceramic/chrome 

temperature ring, spacer ring and shroud 
with the temperature indicator located at 
12 o'clock without turning the spline of 
the thermostatic cartridge. 
Screw the temperature handle in place 
using the washers and screw, replace the 
screw cover.

O-ring

Locating slot

O-ring

O-ring

Stop ring

Step

Содержание AXBRIDGE BC-AXB-149/RRK-BN

Страница 1: ... 149 RRK BN INSTALLATION GUIDE This instruction booklet covers model BC AXB 149 RRK CP BC AXB 149 RRK BN Version 1 1 5 19 VADO Wedmore Road Cheddar Somerset England BS27 3EB tel 01934 744466 fax 01934 744345 www vado com sales vado com ...

Страница 2: ...ocal water supplier see the WRAS website www wras co uk for details or the Water Regulations Advisory Scheme by email info wras co uk or telephone 01495848454 Before making any inlet pipe connections all supply pipes MUST be thoroughly flushed to remove debris Failure to do so could result in damage or low flow from the mixer unit Water Supply Water Fittings Regulations 1999 Schedule 2 Section 13 ...

Страница 3: ... of Packaging Handset Riser with washer Shower hose with 2 washers Shower head with washer Cover O ring Bracket Accessory box 2 Screws x 2 Wall plugs x 2 Dimensions 495mm 205mm 170mm 150mm 921mm 202mm 1070mm 1143mm ...

Страница 4: ...6 7 Installation Quick guide 2 3 1 4 5 6 1 2 3 4 0 5 1 2 3 4 0 5 147 153mm x 3 Installation Quick guide 9 10 8 6mm 1 2 3 5 1 2 3 5 4 7 ...

Страница 5: ...8 9 Installation Quick guide 11 12 14 13 Installation Quick guide 15 16 19 20 18 17 ...

Страница 6: ...shavings to block the filters fitted on inlets 147 153mm Mounting plate Inlet pipe 20 25mm hole Remove the mounting plate from the back of the valve by releasing the three grub screws and pulling out the plate Place the mounting plate in the centre of the marked position and mark the two fixing holes Temporarily place the valve over the copper pipes and mark the back of the body against the wall T...

Страница 7: ... a suitable depth for the wall plugs and secure with supplied screws If you are fitting the valve to a partition wall or a wall of particularly soft substrate you will need specialist fixings Mounting plate Screws Wall plugs Nut Olive Inlet pipe Installation Secure the valve into position by tightening the three grubs crews one at 12 o clock and the other two at 4 and eight o clock Hex key Place t...

Страница 8: ...ion Warning Please check for any hidden cables and pipes before drilling holes in the wall Drill the marked holes to a suitable depth for the wall plugs and secure with supplied screws Slide on the cover Replace the riser onto the valve Slide the riser into the wall bracket Make sure that the riser is vertical and secure in position using the grub screw on the side of the wall bracket Finally tigh...

Страница 9: ...er being delivered from the outlet with a thermometer Note temperature readings should be taken at normal flow rate after allowing the system to stabilise If the temperature is not 38 C proceed to commission the valve as follows Carefully prise out the ceramic screw cover with a suitable flat tool remove the screw and washers and pull off the handle shroud and spacer ring fig 1 Ensure the step on ...

Страница 10: ...rmostatic cartridge fig 3 Note Ensure care is taken as a small amount of residual water may escape when removing the cartridge Fig 5 Fig 4 Maintenance 6 Clean the cartridge filters by rinsing them under running water to remove any debris 7 If there is limescale deposits then it is recommended to immerse the cartridge for a few minutes in 50 white vinegar 50 hot water brush the filters gently and t...

Отзывы: