D
ELUXE
W
ALL
F
URNACE
Page 7
Wall Preparation
C
ONSOLE
U
NITS
Fig. 1
Mounting Brackets- Unit Upgrades
IMPORTANT NOTE: If an existing wall furnace
is being replaced, use the new mounting
brackets provided with the unit.
Preparation of Timer Framed Walls
- see
Fig.1
1. Establish datum line a minimum of
100mm
from the floor or
65mm
above the skirt board if
the skirting board is greater than 65mm.
2. Position the bottom the base plate with the
datum line and fix into position over 2 studs or
centered on one stud.
3. Provide a gas connection at the lower right
hand side of opening – refer to section Gas &
Electrical this document.
4. Cut away ceiling cornice to suit flue screen
size.
5. Cut ceiling penetration hole to suit the twin skin
flue.
6. Header and base plate brackets are located
inside the unit. To get the brackets:-
6.1. Remove the cabinet top retaining screws –
see fig. 3
6.2. Lift the cabinet up and out of the bottom
plastic moulding.
Fig. 2
6.3. Disconnect the thermostat loom
6.4. Disconnect the cabinet earth lead.
7. Fit the base plate to the wall surface, securing
to the wall studs level with the datum line and
central to the location of the heater. Check for
flue obstruction & clearances with roof or
ceiling timbers.
8. Bend top tags of the header plate down to
clear the inside of the front cabinet. Position
header plate and nail in level with datum line
and central to the location of the heater.
Fig. 3
Содержание WFBL26
Страница 9: ...DELUXE WALL FURNACE Page 9 Gas Electrical ...
Страница 13: ...DELUXE WALL FURNACE Page 13 Unit Installation ...
Страница 15: ...DELUXE WALL FURNACE Page 15 Unit Installation ...