5 Operation
bon E-20 SE
5 Operation
5.1 Layout of the switches und buttons on the control console
Switch for dimming the room lights.
(Supplied on customer request.)
On/Off switch (function switch)
the refraction unit.
On/Off switch of the examination
light on the projector column.
of
itch to activate the height
patient chair
9/23
Fig. 5-1: Switches on the control console
5.2 Commissioning
1) Please ensure that the refraction unit is connected to the power supply with the intended
power cable.
2) Press the On/Off switch on the control console (8).
3) The refraction unit is ready for use when the switches as well as the buttons on the
control console are illuminated.
Sw
adjustment of the
(down).
This switch is not occupied as
standard. It can be activate on
request to meet customer needs.
Switch for adjustment of the patient
chair (up).
Содержание E-20 SE
Страница 2: ...DS 2 23...
Страница 18: ...8 Technical data bon E 20 SE Fig 8 3 Circuit diagram 18 23...
Страница 19: ...8 Technical data bon E 20 SE Fig 8 4 Connecting diagram refraction unit bon E 20 SE 19 23...
Страница 21: ...8 Technical data bon E 20 SE Fig 8 7 Connecting diagram adjustable table 21 23...