4 Set up, installation and reconditioning
bon E-20 SE
8/23
4 Set up, installation and reconditioning
The set up and installation of the refraction unit must be carried out by qualified bon Optic
personnel.
Modification or reconditioning
of the refraction unit must only be carried out by bon Optic
authorized personnel. Medical devices which are to be connected to the electrical supply of
the refraction unit must be proved to fulfill their DIN - EN as well as IEC specifications. All
configurations must fulfill the requirements of the system norms DIN EN 60601-1-1
(IEC 601-1). Connection of non medical devices must not detract from the safety of the
system. Modifications to the refraction unit must not endanger patients, users or the
surrounding area.
Repairs that can be carried out by the user can be found in chapter 6: Care and Maintenance.
Содержание E-20 SE
Страница 2: ...DS 2 23...
Страница 18: ...8 Technical data bon E 20 SE Fig 8 3 Circuit diagram 18 23...
Страница 19: ...8 Technical data bon E 20 SE Fig 8 4 Connecting diagram refraction unit bon E 20 SE 19 23...
Страница 21: ...8 Technical data bon E 20 SE Fig 8 7 Connecting diagram adjustable table 21 23...