Field Pack-Up (FPU
®
) Series
5.1.4
The sequence for deploying the workstations is as follows:
1. Remove the workstation retention pins located outside the container (3) and attached to each
side of the workstation.
See Fig. 5.2-1.
2. After electrical power, ground connection and lighting has been established, two personnel
should enter the container, one from the main entrance door (1) and the other from the
secondary entrance door (2).
See Fig. 5.1-1.
3. At this point the ratchet straps (2) and pins (1) from both workstations may now be removed
and workstations A and B may be deployed.
See Fig. 5.1-2.
4. Secure the workstations A and B with pins (1) to prevent their movement.
See Fig. 5.1-2.
5. Proceed to third workstation C next to the main entrance door and remove the pins (1) and
ratchet straps (2) and deploy the workstation.
See Fig. 5.1-2.
6. Secure the workstation C with pins (1) to prevent its movement.
See Fig. 5.1-2.
5.2
EWCC WorkStation Preparation for Shipment
5.2.1
Retracting and securing sequence for the three workstations is as follows:
1. Remove the securing pins from workstation A with assistance from other personnel from the
exterior of the container, push the workstation (1) until fully retracted and the hand holds (2)
are together and outer seal (3) makes good contact.
See Fig. 5.2-1.
Figure 5.2-1
Retracting the Work-Stations
2. Secure the workstation with the pins (1) and ratchet straps (2).
See Fig. 5.1-2.
3. Remove the securing pins (3) from workstation B with assistance from other personnel from
the exterior of the container, push the workstation until fully retracted and the outer seal
makes good contact.
4. Secure the workstation with the pins (1) and ratchet straps (2).
See Figure 5.1-2.
5. Proceed to third workstation C next to the main entrance door and remove the securing pins
(1) with assistance from other personnel from the exterior of the container, push the
workstation (1) until fully retracted and the outer seal (3) makes good contact.
6. Secure the workstation with the pins (1) and ratchet straps (2).
See Figure 5.1.2.
Re-attach
Workstation retention pins located outside the container.
1
2
3
19
Содержание 8145-01-502-3927
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 3: ...Field Pack Up FPU Series i Figure 1 1 1 BOH EWCC Data Plates Location...
Страница 4: ...Field Pack Up FPU Series ii Figure 1 1 2 BOH CCC Data Plates Location...
Страница 11: ...SECTION I INTRODUCTION AND GENERAL INFORMATION...
Страница 12: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 15: ...Field Pack Up FPU Series SECTION II CCC and EWCC COMPONENTS AND ACCESSORIES...
Страница 16: ...Field Pack Up FPU Series THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 18: ...Field Pack Up FPU Series Figure 2 1 1 CCC Accessories Locations 1 2 3 4 5 6 7 8 4...
Страница 20: ...Field Pack Up FPU Series Figure 2 2 1 EWCC Accessories Locations 1 2 4 3 6 5 8 7 9 6...
Страница 21: ...Field Pack Up FPU Series SECTION III CCC and EWCC PREPARATION FOR USE STORAGE MOVEMENT AND SHIPMENT...
Страница 22: ...Field Pack Up FPU Series THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 25: ...Field Pack Up FPU Series SECTION IV CCC and EWCC SETUP AND OPERATIONS...
Страница 26: ...Field Pack Up FPU Series THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 36: ...Field Pack Up FPU Series THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 37: ...Field Pack Up FPU Series SECTION V EWCC EXPANDABLE WORKSTATIONS...
Страница 38: ...Field Pack Up FPU Series THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 41: ...Field Pack Up FPU Series SECTION VI CCC AND EWCC MAINTENANCE GUIDE...
Страница 42: ...Field Pack Up FPU Series THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 46: ...Field Pack Up FPU Series THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 47: ...Field Pack Up FPU Series SECTION VII CCC and EWCC ELECTRICAL COMMUNICATION DIAGRAMS...
Страница 48: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 50: ...Field Pack Up FPU Series...
Страница 51: ...Field Pack Up FPU Series Figure 7 1 2 AC Side Layout 24...
Страница 52: ...Field Pack Up FPU Series...
Страница 53: ...Field Pack Up FPU Series Figure 7 1 3 EWCC Load Center Layout 25...
Страница 54: ...Field Pack Up FPU Series...
Страница 55: ...Field Pack Up FPU Series Figure 7 1 4 EWCC End Layout 26...
Страница 56: ...Field Pack Up FPU Series...
Страница 57: ...Field Pack Up FPU Series Figure 7 1 5 CCC Load Center Layout 27...
Страница 58: ...Field Pack Up FPU Series...
Страница 60: ...Field Pack Up FPU Series 28...
Страница 61: ...Field Pack Up FPU Series...
Страница 62: ...Field Pack Up FPU Series Figure 7 1 7 CCC and EWCC Communications Layout 29...
Страница 63: ...SECTION VIII CCC and EWCC PARTS LISTS...
Страница 64: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 66: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 67: ...SECTION IX CCC and EWCC WARRANTY...
Страница 68: ...Field Pack Up FPU Series THIS PAGE INTENTIONALLY LEFT BLANK...