22
Elite
Step 7:
Install Top Cable
L
NOTICE
Assemble cables and pulleys simultaneously.
1. See Fig. 1: Insert the Bolt-end of the TOP CABLE (82) through the bottom of the front slot of
the TOP FRAME (4), then over Pulleys T1 and T2 as shown. Secure each pulley using one 3/8” X
109.5L FLAT PIN BOLT (140) and one M6 X 12L MALE SCREW (147). Tighten. NOTE! The cable runs
above the TOP FRAME (4), NOT inside the tube.
2. See Fig. 2/Fig. 3: Countinue routing the cable entering the top and exiting on bottom of the
Left Side Pulley T3 mount to the PRESS ARM SUPPORT (9) using one 3/8” X 2-3/4” HEX BOLT
(142) and one 3/8” NYLA-NUT (170). DO NOT Tighten. Route cable around Pulley T4 mounted
on the FRONT UPRIGHT (3) by entering the bottom and exiting the top. Secure using one 3/8” X
1-3/4” HEX BOLT (134) and one 3/8” NYLA-NUT (170). Tighten. Route the cable around Right Side
Pulley T5 mounted in the PRESS ARM SUPPORT (9), by entering the top and exiting the bottom.
Tighten.
3. See Fig. 4: Route the cable under Pulley T6 and mount in the slot in the FRONT UPRIGHT (3) using
one 3/8” X 1-3/4” HEX BOLT (134) and one 3/8” NYLA-NUT (170). Continue to route the cable over
Pulley T7 and mount to the top rear of the FRONT UPRIGHT (3) using one 3/8” X 109.5L FLAT PIN
BOLT (140) and one M6 X 12L MALE SCREW (147). Tighten.
4. See Fig. 5: Install a 4-1/2” PULLEY (100) into each of the ADJ. PULLEY BLOCKS (23) in the second
hole below the welded stop plate. (DO NOT TIGHTEN. You may need to move the pulleys when
adjusting the cables).
L
NOTICE
The ADJ. PULLEY BLOCKS (23) do not attach to the frame, they are held in place by the cable.
5. See Fig. 6/Fig. 7: Route the cable over Pulleys T9 and T11 mounted to the TOP FRAME (4) while
simultaneously routing the cable under the installed Pulleys T8 and T10 mounted in the ADJ.
PULLEY BLOCKS (23). Secure Pulley T9 using one 3/8” X 2-3/4” Hex Bolt (142) and one 3/8“ NYLA-
NUT (170) and Pulley T11 using one 3/8” X 1-3/4” HEX BOLT (134) and one 3/8” NYLA-NUT (170).
Tighten Bolts at T9 and T11.
6. See Fig. 8: Secure the TOP CABLE (82) by threading the Bolt-end at least a third of the way
into the TOP PLATE ASSEMBLY (58). Tighten Jam-nut on the Bolt-end against the TOP PLATE
ASSEMBLY (58).
7. Tighten all bolts, nuts and Jam-nuts.
⚠
CAUTION
At least one third of the thread must be screwed into the top weight plate.
Содержание SW-95.0225-G
Страница 2: ...2 Elite...
Страница 11: ...11...
Страница 12: ...12 Elite Pre assembled...
Страница 15: ...15...
Страница 17: ...17...
Страница 19: ...19...
Страница 23: ...23...
Страница 30: ...30 Elite...
Страница 35: ...35...
Страница 37: ...37...
Страница 48: ...48 Elite 7 3 Exploded Drawing Multi Gym...
Страница 50: ...50 Elite 7 5 Exploded Drawing Leg Press...
Страница 55: ...55 Notes...
Страница 56: ...56 Elite Notes...
Страница 57: ...57...
Страница 58: ...Elite Multi Gym...