15
STEP 9 INSTALL CONNECT CABLE
1. Hook the steel ball end of the Connect Cable (90) to the receptor C1 welded to the Base
Frame (1). Route the cable up and over Pulley C2 mounted to the bottom of the Double
Pulley Block (19) using one 3/8" X 1-3/4" Hex Bolt (101) and one 3/8" Nylon Nut (124).
2. Screw the threaded end of the cable half way into the threaded receptor on the Adj.
Floating Pulley Block (20). The threaded end of the cable is an adjustment point but
should always have at least one third of the threads screwed into the Adj. Floating Pulley
Block (20).
Содержание BCG-GX
Страница 3: ......
Страница 13: ...12 STEP 6 INSTALL TOP CABLE ...