LPT
23
4.3
Maintenance and Inspection Calendar
To avoid damage from body sweat, the equipment must be cleaned with a damp towel (no solvents!)
after each training session.
The following routine tasks must be performed at the specified intervals:
Part
Weekly
Monthly
Quarterly
Half-yearly
Yearly
Cables and pulleys
C/I
Bolt connections
I
Pulleys and cables
I
C = clean; I = inspect
5
DISPOSAL
At the end of its operational life, this equipment cannot be disposed of in normal household waste.
Instead, it must be disposed of via an electricals recycling centre. Further information can be
obtained from your local authority‘s recycling service.
The materials can be recycled as per their symbols. Through the reuse, recycling
of materials or other forms of recovery of old equipment, you make an important
contribution to the protection of the environment.
Содержание BC-LPT
Страница 1: ...TF BC LPT 01 02 Lat Pull Tower BC LPT Assembly and Operating Instructions ...
Страница 2: ...LPT 2 ...
Страница 11: ...11 ...
Страница 17: ...17 ...
Страница 19: ...19 ...
Страница 28: ...LPT 28 7 3 Exploded Drawing ...
Страница 33: ...33 Notes ...
Страница 34: ...LPT 34 Notes ...
Страница 35: ...35 ...
Страница 36: ...Lat Pull Tower ...