Step 3
NOTE:
Some hardware components may be pre-assembled. Be aware of
Nylon lock nuts not fully screw onto bolts, they must be tightened
with a wrench to ensure proper engagement.
3A.
Attach Handle Bar (C) to Upright (B) using:
Four M8x16mm Button Head Cap Screw (#17)
Four M8 Lock Washer (#19)
Four M8 Flat Washer (#20)
3B.
Connect Wire Harness (#15) & Heart Rate Cable (#16) to the
Cables of the Console (H)
3C.
Attach Console (H) to Handle Bar (C) using:
Four M5x10mm Pan Head Phillips Screw (#29)
3D.
Attach L Shape Holder (L) to Console (H) using
Two M5x10mm Pan Head Phillips Screw (#29)
4E.
Attach the Water Bottle Holder (K) to Upright (B) using:
Two ST4.2x18mm Pan Head Phillips Screws (#26)
Two 9x4mm Flat Washer (#27)
10
Содержание ENDURANCE B4UB
Страница 1: ...B4UB Endurance B4UB Upright Bike User Manual V B4UB 20190625 ...
Страница 15: ...Dimensions 15 ...
Страница 25: ...Console Operation 25 Figure 3 Figure 4 Figure 5 PRESET PROGRAMS Figure 6 Figure 7 Figure 8 Figure 9 ...
Страница 43: ...NOTE 43 ...