PBC1835
Page 11
Assembly STEP 4
A.
Align and attach the left Upright Angle Support Frame
(#09)
to the
Left Bottom Frame
(#07)
. Insert two Carriage Bolts
(#24)
through the
bottom of the left Bottom Frame
(#07)
. Please hand tighten the two
Nylon Nuts
(#30)
on the lower portion for now as it may be difficult to
align the holes for the upper portion if the parts are too tightened at
this point in assembly.
B.
Align and attach Left Upright Frame
(#16)
to the Left Bottom Frame
(#07)
and Upright Angle Support Frame
(#09)
. Insert two Hex Bolts
(#21)
through both Left Upright Angle Support Frame
(#09)
and Left
Upright Frame
(#16)
. Secure them together using two Big Washers
(#27)
and two Nylon Nuts
(#30)
.
C.
Align two Reinforcement Plates
(#17)
to Left Bottom Frame
(#07)
and Left Upright Frame
(#16)
as illustrated. Insert four Hex Bolts
(#22)
through one Reinforcement Plate
(#17)
, left Bottom Frame
(#07)
,
left Upright Frame
(#16)
, and one other Reinforcement Plate
(#17)
.
Secure them together using four Nylon Nuts
(#
3
0)
.
D
. Repeat this process on the other side.
Hardware Required
POWER RACK
A
B
C
D
#30 Nylon Nut (M10)
[16 Pieces]
#27 Large Washer (M10)
[4 Pieces]
#21 Hex Bolt (M10X60mm)
[4 Pieces]
#24 Carriage Bolt
(M10X45mm)
[4 Pieces]
#22 Hex Bolt (M10X80mm)
[8 Pieces]
Содержание PBC1835
Страница 2: ...This page is left blank intentionally ...
Страница 18: ...This page is left blank intentionally ...
Страница 19: ...This page is left blank intentionally ...