6.4  User Parameters 

 
NOTE:  Through  the  LVD  keypad  you  have  full  access  to  all  system  Parameters,  DO  NOT  adjust  any 
parameters other than those show below as this may have a serious adverse affect on the operation of 
the unit.
 
 
Pr01  Homing  Speed  &  Direction,  the  speed  is  set  RPM  for  the  motor  shaft,  but  the  gearbox  must  be  born  in 
mind, e.g. for this application I decided to run at 10 RPM, the motor has a 7-1 gearbox, ( 10 x 7 = 70 ) and to 
make the motor run clockwise it is a positive value ( negative for anti-clockwise ). 
If this value is altered then the screw will be slightly out of position at the start of testing, leave set to 
70. 
 
Pr 16 
Integral Gain Speed Loop, ( should be set to 80 for this application ). 
 
Pr17
 Speed Control Loop Damping, ( should be set to 180 for this application ). 
 
Pr26
 Sets Baud Rate for serial communications, default is 6 which equates to 19200. 
 
Pr29 
Sets the number of Motor Poles ( in this particular application should be set to 4 ). 
 
b40.14
 Enable Serial Communication, set to 1 to enable serial comms with laptop, 0 to disable. 
This Parameter bit should always be set 1. 
 
Pr51  Acceleration  &  Deceleration  time  for  normal  operation,  in  this  application  set  to  0.1  seconds  (  will  be 
displayed as 100 on the LVD2 drive display ). 
 
Pr52  
Motor  Speed  for  normal  operation,  the  speed  is  set  RPM  for  the  motor  shaft,  but  the  gearbox  must  be 
born in mind, e.g. for this application we want to get 6 revolutions in as quick a time as possible, the optimum 
value for this parameter was found by experimentation, e.g. the speed was increased until the optimum value 
was found which gave the highest speed yet maintained smooth operation, this was found to be 2250 to convert 
this to an actual speed it must be divided by the gearbox ration ( 2250 / 7 = approx. 320 RPM )  this equates to 
5.33 revolutions per second giving a ‘Screw In’ time of  1.125 seconds for six bottles. * 
 
Pr64 Distance of travel for normal operation, set in steps where one complete revolution of the motor shaft is 
4096 steps, so for 6 revolutions, bearing the gearbox in mind ( 4096x6x7 = 172032 )
NOTE: Because this value is longer than 1 ‘word’ the value when entered will ‘overlap’ into parameter 
Pr65, this is normal. 
 
b70.4
 Direction of travel for normal operation, set to 1 or 0 as appropriate to set the desired direction of travel. 
 
b99.6  
Extended  Parameter  Access,  setting  this  parameter  bit  to  1  gives  the  user  full  access  to  all  system 
parameters via the LVD2 Keypad. 
 
b99.13  
PLC  Operation  mode,  sets  the  mode  of  operation  of  the  on-board  micro  PLC,  set  to1  to  run  the 
program, 0 to edit the program from the plug-in keypad ( highly un-recommended ).  
This Parameter bit should always be set 1. 
 
b99.15  Save  Parameter  Changes  –  If  any  Parameters  been changed, then this bit must be set to save those 
changes,  after  setting  it  will  immediately  reset  itself  automatically.  See  important  notes  on  page  1  of  this 
document.
 
 
* The overall cycle time and bottle throughput for this unit is based around the screw speed noted above, if this 
speed  is  altered  than  the  unit  cannot  be  guaranteed  to  operate  at  the  required  speed.  Also  the  settings 
associated  with  the  reject  feature  –  ‘Reject  Delay’,  ‘Reject  On  Time’  and  ‘Reject  Off  Time’  will  need  to  be 
adjusted to keep the reject routine in synchronisation with the new motor speed, and a new appropriate value 
for ‘Screw Timeout’ must be set. 

Содержание AQS610-EU-SF

Страница 1: ...5HZ The majority of equipment designed and manufactured by BMC Controls Ltd is protected by patents and industrial design copyright Examples of this include our PLASMA leak testing technique stepper m...

Страница 2: ...TAL DISPLAY 12 4 2 KEYPAD 12 4 3 PAGE SELECT KEYS 12 4 4 CURSOR KEYS 12 5 DISPLAY PAGES 13 5 1 PARAMETERS 13 5 1 1 Test Information 13 5 1 2 Test Parameters 14 5 2 FUNCTIONS 15 5 2 1 I O Forcing 15 5...

Страница 3: ...rejected as they leave the screw If the unit is for the U K and European market it uses mB as its pressure measurement unit the version for the USA uses Psi 1 1 Leaktest station The standard leaktest...

Страница 4: ...e SCREW ERROR will be displayed 4 After a delay set by the operator Head Delay the Test head cylinders are extended this can be set to zero if no delay is required 5 The Fill valves are turned on 6 Th...

Страница 5: ...tiated as the screw starts to turn to bring the next set of bottles into the tester 2 There is a settable delay Reject Delay which elapses before the reject routine proper starts to ensure that bottle...

Страница 6: ...System layout drawing NOTE The reject position is the last position where the bottle is still held in position by the screw Bottle indexing screw Test heads Dead plate Direction Of Travel Start P S Le...

Страница 7: ...L RATE regulators to zero Initially fully restrict the Reject Blower Adjust the guide rails so that bottles travel centrally down the conveyor 3 2 Proximity Sensor The screw home position detection se...

Страница 8: ...esent the photocell with a typical background object that is to be ignored e g hold a bottle behind the far guide rail in line with the sense path 5 Press the button once and release The photoswitch i...

Страница 9: ...pressure should be such that the test heads should be able to be lifted off the bottle necks by hand using a moderate amount of force such as that required to lift a bag of sugar with one hand Force...

Страница 10: ...onds The test pressure Test Press is normally left set to 30 mB 0 5 Psi However this can be adjusted if necessary if there is a specified test pressure or if the bottle is being distorted To set the M...

Страница 11: ...assed decrease Reject Delay NOTE When optimising the reject station settings very small changes should be made between tests i e not more than 0 02 seconds per change Repeat this procedure until clean...

Страница 12: ...ill re start this 5 minute countdown When the backlight is not illuminated pressing any key on the AQS keypad will cause the back light to illuminate again and the 5 minute countdown to re start 4 2 K...

Страница 13: ...d see troubleshooting or no bottle was present in that test position O The previous container failed the leaktest as over pressure some system adjustment is required see troubleshooting There are also...

Страница 14: ...in channel 4 9 Pressure 5 LIVE pressure reading for channel 5 10 Final P 5 Final pressure of the last bottle leak tested in channel 5 11 Pressure 6 LIVE pressure reading for channel 6 12 Final P 6 Fi...

Страница 15: ...display will show the currently selected input or output along with it s forced status and it s normal status Inputs and outputs are shown in groups of four the one to be altered will be highlighted w...

Страница 16: ...may look as follows OP s 1000101011001 1 IP s 0010 10 Output 1 is normally on Input 5 is forced on Output 6 is normally off Output 16 is forced off IMPORTANT After I O forcing always ensure that all f...

Страница 17: ...s 7 Reject On Time Time for which the Reject Blower activates to remove a failed bottle from the container this must be carefully set to match the screw revolution time 8 Reject Off Time Delay between...

Страница 18: ...rrupted contact BMC Controls for a service visit Er 11 Parameter Checksum error some or all of the system parameters have become corrupted check and re enter the system parameters as described below i...

Страница 19: ...eased until the optimum value was found which gave the highest speed yet maintained smooth operation this was found to be 2250 to convert this to an actual speed it must be divided by the gearbox rati...

Страница 20: ...reject blower output to check the electronics and the valve solenoid Manually turning on the valve will check the valve operation See Functions section and I O list and front panel controls for detail...

Страница 21: ...b99 13 set to 1 and Enable IP made on X7 pin 1 connected to pin 5 The screw does turn 1 If the screw rotates through more than 1 revolution at power up then stops with SCREW ERROR displayed The screw...

Страница 22: ...ts are PNP i e switch 24V onto the signal line OUTPUT FUNCTION HARDWARE 1 HEAD_CLAMP SOLENOID VALVE CYLINDER 2 REJECT SOLENOID VALVE BLOWER 3 UNUSED 4 UNUSED 5 UNUSED 6 HOME_SCREW RELAY OP TO LVD DRIV...

Страница 23: ...NB All inputs are PNP i e switch 24V onto the signal line LVD2 X7 Input Connector Pin Usage Pin No Function 5 24 V Common 1 Input 0 Enable 9 Input 1 2 Input 2 10 Input 3 3 Input 4 11 Input 5 4 Input...

Страница 24: ...em i e already mounted on a conveyor an emergency stop button will already be fitted If the unit is supplied in kit form the emergency stop circuitry is still fitted in the cabinet but is linked out i...

Страница 25: ...ICAL GUIDE Page 25 10 Control Panel connections INPUT 1 INPUT 2 INPUT 3 NOT USED PRESS SENSE1 NOT USED PRESS SENSE2 NOT USED CABLETO PNEUMATIC CABINET PRESS SENSE3 RS232 PORT PRESS SENSE4 INPUT EXPANS...

Страница 26: ...c Parts 290 4651 TM24064BBCW CC XT3 CP CC XT3 8SIP CC XT3 16OP CC XT3 MB Chameleon for Analogue card for Topbox Connector LCD Display AQS Keypad AQS Input Card AQS OP Card AQS Motherboard Micro Proces...

Страница 27: ...his test head is a solid construction with a flat mating face no flexibility Mechanical block bore This test head has a plunger which enters the neck of the bottle if the plunger is pushed a mechanica...

Отзывы: