Document #: BPI-PM001-01
26
Instructions
1. I
nsert 2 channel nuts 12” apart in Unistrut® channel. Please note Unistrut channel is
existing in client facility.
Figure 19: Placement of Channel Nuts in Unistrut Channel
2. Attach mounting plate to Unistrut channel by inserting hex screws with washer and
lock washer into channel nuts.
Figure 20: Attaching Mounting Plate to Unistrut Channel
1
1
1
Содержание 420 Series
Страница 4: ...Document BPI PM001 01 3 Key Components Figure 1 Bluezone Key Components 2 3 5 4 1 6 ...
Страница 7: ...Document BPI PM001 01 6 Figure 4 Wiring Diagram of Model 420 048 Unit ...
Страница 10: ...Document BPI PM001 01 9 Figure 6 Illustration of the Ceiling Mount and Shelf Mount ...
Страница 13: ...Document BPI PM001 01 12 Figure 8 Display Sequence in Time ...
Страница 16: ...Document BPI PM001 01 15 Figure 9 Bluezone Cover Switch and Cover Switch Hole Cover switch hole Cover switch ...
Страница 22: ...Document BPI PM001 01 21 Figure 14 Carefully Slide off Bulb Clips using Nitrile Gloves ...
Страница 23: ...Document BPI PM001 01 22 Figure 15 Completed Bulb Assembly Figure 16 Bulb Counter Reset Button ...
Страница 30: ...Document BPI PM001 01 29 Figure 24 Completed Assembly ...
Страница 32: ...Document BPI PM001 01 31 Figure 26 Shelf Mount Dimensions ...
Страница 36: ...Document BPI PM001 01 35 Figure 32 Screws Installed into Bluezone Muffler and Fan Cover ...
Страница 37: ...Document BPI PM001 01 36 Figure 33 Completely Installed Bluezone Muffler ...