9
POOL SETUP
POOL SITE PREPARATION
Remember ground preparation is the most important step in the installation of the pool. Do
not install the pool over underground power lines, sewer lines, or other structures. Do not
install on cement, asphalt, or other hard surfaces.
1. Mark off the pool area by driving a stake in the center of the area where the pool will be installed.
Have a helper hold a tape measure or a string and mark off the pool perimeter using flour, chalk, or
spray paint. Remove all sod inside the pool area to 1-ft (30-cm) beyond the dimensions of
the pool.
2. If the area selected for pool installation has Nut Grass, Bermuda Grass, or another type of
persistent grass it is recommended a topical grass treatment is applied and to wait at least 48 hours
before continuing with installation.
3. After removing the sod, rake the dirt to remove any small rocks, stones, roots, sticks or other debris
that could cause damage or tear the pool liner.