background image

17

INSTALLING THE METAL PLATE

•  Hook the metal plate over the top of the rail (see diagram 25). The first metal plate should be 

placed on top and in the middle of the pool wall joint (see diagram 26).

ASSEMBLY OF THE RESIN VERTICAL SUPPORTS 

•  Line up the screw holes for the vertical supports. The first resin vertical support should be placed 

over the joint in the pool wall. Fix resin vertical supports onto the metal plates. Line up the screw 
holes and check if the vertical sections are in line. Once all resin vertical supports are in place and 
straight, fix the resin vertical supports with screws provided (see diagram 27, 28, and 29).

Make sure that the metal plate at the top is directly above the metal plate at the bottom.

Содержание SAVANNAH NB19821

Страница 1: ...19822 NB19823 SAVANNAH ROUND 52 IN DEEP RESIN POOL WITH 8 IN TOP RAIL INSTRUCTION MANUAL Questions problems missing parts Before returning to your retailer call our Consumer Hotline at 1 800 759 0977...

Страница 2: ...10 ASSEMBLING THE POOL RAIL 11 INSTALLING THE POOL WALL 12 MEASURING THE POOL WALL 13 PROTECTIVE SAND CUSHION 14 INSTALLING THE POOL LINER 15 INSTALLING THE METAL PLATE 17 ASSEMBLY OF THE RESIN VERTIC...

Страница 3: ...e of issues during assembly or use of this product please contact our Consumer Hotline at 800 759 0977 for immediate assistance before contacting your retailer Please read the warranty information at...

Страница 4: ...is not accessible to children DANGER Prevent the risk of accidental drowning Extreme caution must be exercised to prevent unsupervised access by children To avoid accidents ensure that children canno...

Страница 5: ...bers near a phone and the pool Teach your children to swim Keep any object that could be used by a child to climb into the pool at least 4 ft away from the side of the pool Read these safety instructi...

Страница 6: ...d life jacket and without adult supervision Flotation devices are not a substitute for adult supervision Do not leave toys near or in the pool with no supervision Always keep the water clear and sanit...

Страница 7: ...1 2 NBP6029 RESIN BOTTOM RAIL 201810011 12 NBP6042 RESIN BOTTOM RAIL 201810012 16 NBP6043 RESIN BOTTOM RAIL 201810013 20 3 NBP6030 COPING 20181002 12 16 20 4 NBP6031 RESIN ROUND RAIL 20181003 12 16 2...

Страница 8: ...Plate Vertical Support Sharp knife Site excavation tools 4 ft X 4 ft piece of plywood Protective gloves Acceptable Flat level firm and dry ground Easy access to all sides of the pool Position in a sp...

Страница 9: ...e a helper hold a tape measure or a string and mark off the pool perimeter using flour chalk or spray paint Remove all sod inside the pool area to 1 ft 30 cm beyond the dimensions of the pool 2 If the...

Страница 10: ...ure that the site is completely level see diagram 1 Remove the higher ground rather than filling the low laying ground see diagram 2 Once the pool site is completely leveled debris removed and ground...

Страница 11: ...ends of the bottom rails see diagram 6 Diagram 4 Diagram 5 Diagram 6 IMPORTANT Leave about 0 4 in 1 cm gap between the 2 ends of the bottom rail NOTE It is recommended that a 2 in patio block is place...

Страница 12: ...filtration system will be placed The opening end of the pool wall closest to the square skimmer opening should be placed on the closest metal plate to the location that has been selected for the elec...

Страница 13: ...w spots to make sure the differences of each diameter and width measured are within 0 8 in 2 cm CAUTION Try not to damage any of the components if disassembling the pool wall to correct the ground lev...

Страница 14: ...sary to build a protective cove made of moist sifted dirt or fine brick layer s sand at the base of the pool wall see diagram 17 and 18 The size should be 6 in H x 6 in W so that it completely seals t...

Страница 15: ...nd so it is perpendicular to the ground Drape the pool liner over the pool wall There should be an overlap of about 3 in 8 cm over the pool wall height see diagram 19 and 20 Temporarily hold the overl...

Страница 16: ...ch coping strip Make sure to leave a 0 6 in 1 5 cm gap between the two ends of the rail see diagram 24 then connect another round rail and continue around the circle until all round rails are joined t...

Страница 17: ...for the vertical supports The first resin vertical support should be placed over the joint in the pool wall Fix resin vertical supports onto the metal plates Line up the screw holes and check if the...

Страница 18: ...ne up the screw holes and lightly fasten with the bolts provided CAUTION Fix all resin top platforms to the metal plate at the top and make sure they are all sitting properly before finally tightening...

Страница 19: ...re attached to the skimmer and return fitting finish filling the pool Before filling the pool with water thoroughly check to see if there are any loose screws not tightened during the pool frame insta...

Страница 20: ...each decal or sign Position as indicated in the images to the right 2 Press the decal or sign firmly against the top ledge liner or wall making sure to not wrinkle the decal or sign 3 Press out any b...

Страница 21: ...d other instructions in the filtration system manual 4 Clean the the liner regularly with non abrasive brushes or an approved vacuum system 5 Run filtration system at least one full day before using t...

Страница 22: ...ure must be installed following the manufacturer s instructions The pool must be used for the intended recreational purposes only All transportation costs for components replaced under warranty are th...

Страница 23: ...enue St Charles IL 60174 At least 6 pictures showing the general pool installation including a picture of the skimmer and water return section of the pool wall a wide angle picture of the backyard and...

Отзывы: