17
INSTALLING THE METAL PLATE
• Hook the metal plate over the top of the rail (see diagram 25). The first metal plate should be
placed on top and in the middle of the pool wall joint (see diagram 26).
ASSEMBLY OF THE RESIN VERTICAL SUPPORTS
• Line up the screw holes for the vertical supports. The first resin vertical support should be placed
over the joint in the pool wall. Fix resin vertical supports onto the metal plates. Line up the screw
holes and check if the vertical sections are in line. Once all resin vertical supports are in place and
straight, fix the resin vertical supports with screws provided (see diagram 27, 28, and 29).
Make sure that the metal plate at the top is directly above the metal plate at the bottom.