background image

The lower LEFT handrail on the exterior portion of the entry has holes to accept the gate 
hinges  &  gate  stop  (see  Details  8.1  &  8.2).  Begin  by  securing  the  gate  stop  in  place 
(Detail 8.3). Fit the stop on the outside face of the handrail over the 

center

 two holes - 

it is form fitting (see Detail 8.4). Secure using two 1/4 x 3/4" bolts, washers on inside & 
nuts. Tighten hardware. Fit the outer hinges in place around the handrail at the top and 
bottom hole locations (see Detail 8.5 & 8.6). Likewise, they are form fitting and will snap 
around  handrail. 

HINT

:  the  outer  hinges  are  tight  fitting  and  it  is  much  easier  if  the 

outer  hinge  parts  are  heated  before  fitting  them  in  place.  Gently  heat  parts  with  hot 
water, blow dryer or leave them in direct sunlight so the plastic becomes more flexible 
and is easier to fit around handrail. The inner hinge parts fit on the inside of the handrail 
and align with the large on the outside (see Detail 8.7). Use two 1/4 x 3/4" bolts, wash-
ers & nuts on the inside face and secure 

LOOSELY

 in the back two holes, through the 

handrail (only FINGER TIGHT - see Detail 8.7). It is important to leave a  gap between 
the inner & outer hinge parts so you are able to fit the gate through (see Step 9). See 
Detail 8.8 - 8.10 for proper placement of all gate parts 

Step 8: FIT & SECURE GATE 

STOP & GATE HINGE SETS 

OUTER 

INNER 

8.3 

8.4 

8.5 

8.6 

8.7 

8.1

8.8 

8.9 

8.10

NEVER USE ENTRY SYSTEM WITHOUT GATE ATTACHED AND FULLY FUNCTIONAL AT 

ALL TIMES. GATE SHOULD REMAIN LATCHED & LOCKED WHEN POOL IS NOT IN USE 

GAP 

8.2 

LEFT 

Содержание NE1415W

Страница 1: ...times to prevent unwanted entry injury Ensure the bottom of the side support stringers are free of debris any possible sharp edges as not to damage the pool liner Use of a ladder or step pad sold sep...

Страница 2: ...The colder the material the harder it will be to fold the parts HINT if you heat the entire center line of the tread risers they will fold much easier Using hot water a heat gun or hair dryer or even...

Страница 3: ...om riser already installed The riser portion will fit into the next indentation above it Press the tread riser into the stringer until the button lock knobs on the ends protrude through the holes and...

Страница 4: ...on all lower handrails at all bolt flanges After all handrails secured secure upper handrails with step stringers using same hardware Detail 6 7 Drill a 5 16 hole if bolt holes do not perfectly align...

Страница 5: ...l Insert a stainless lock pin into each hole drilled protruding equally on both sides of the handrail see Detail 7 5 Push the top platform down firmly snapping and locking it over all pins Detail 7 6...

Страница 6: ...in place Gently heat parts with hot water blow dryer or leave them in direct sunlight so the plastic becomes more flexible and is easier to fit around handrail The inner hinge parts fit on the inside...

Страница 7: ...ED Proceed to GATE LATCH SHIELD installation following page BE SURE TO REVIEW ALL INSTRUCTIONS FOR PROPER USE AND SAFETY WITH ALL INDIVIDUALS USING THIS POOL ENTRY SYSTEM ALWAYS SWIM SAFELY AND REMEMB...

Страница 8: ...pwards to outside face of upper handrail fold end approx 1 5 2 inches Mark handrail at fold in string for location of eye screw see also Step 5 below 1 5 2 Inches Step 5 Screw the eye screw into the o...

Страница 9: ...WC URSH T 32 4 HOLE TOP PLATFORM 1 VWC 4HP32 W VWC 4HP32 T GATE STOP 1 VWC GS W VWC GS T 1 4 20 x 3 4 S S BOLT 30 VWC 1420X34SSB VWC 1420X34SSB 1 4 20 x 1 1 8 S S BOLT 8 VWC 1420X118SSB VWC 1420X118SS...

Отзывы: