BLUE SKY Solar Boost 2512i Скачать руководство пользователя страница 3

Installation and Operation Manual  

 

IMPORTANT SAFETY INSTRUCTIONS 

 

This manual contains important instructions for Models SB2512i and SB2512iX 

SAVE THESE INSTRUCTIONS 

 

1.  Refer installation and servicing to qualified service personnel. High voltage is present inside unit. Incorrect installation or use may result in risk of electric shock 

or fire. No user serviceable parts in this unit. 

 

2.  To reduce the risk of electric shock, fire or personal injury, the following symbols are placed throughout this manual to indicate dangerous conditions, or 

important safety or operational instructions. 

 

WARNING 

CAUTION 

IMPORTANT 

 

 

 

 

 

 

)

 

Indicates dangerous conditions or electric 

shock potential. Use extreme caution. 

Indicates items critical to safe installation or 

operation of the unit. 

Follow these instructions closely for proper 

operation of the unit 

 

3.  PERSONAL PRECAUTIONS 

a)  Working in the vicinity of lead-acid batteries is dangerous. Batteries produce explosive gasses during normal operation. 
b)  To reduce risk of battery explosion, follow these instructions and those published by battery manufacturer and manufacturer of any equipment you intend 

to use in vicinity of battery. 

c)  Someone should be within range of your voice or close enough to come to your aid when you work near a lead-acid battery. 
d)  Have plenty of fresh water and soap nearby in case battery acid contacts skin, clothing or eyes. 
e)  Wear complete eye protection and clothing protection. Avoid touching eyes while working near battery. 
f)  If battery acid contacts skin or clothing, wash immediately with soap and water. If acid enters eye, immediately flood eye with running cold water for at 

least 15 minutes and get medical attention immediately. 

g)  NEVER SMOKE or allow a spark or flame in vicinity of battery. 
h)  Be extra cautious to reduce risk of dropping metal tool onto battery. It might spark or short circuit battery or other electrical part that may cause explosion. 
i)  Remove personal metal items such as rings, bracelets and watches when working with a lead-acid battery. A lead-acid battery can produce a short circuit 

current high enough to weld a ring or the like to metal, causing a severe burn. 

j)  Remove all sources of power, photovoltaic and battery before servicing or installing. 

 

4.  CHARGER LOCATION & INSTALLATION 

a)

 

This unit is designed to charge 12V (6 cell) flooded or sealed type lead-acid chemistry batteries within the range of 20 to 10,000 amp-hours. Follow 
battery manufacturers charging recommendations when considering this unit for use with other battery chemistry. 

b)

 

This unit employs components that tend to produce arcs or sparks. NEVER install in battery compartment or in the presence of explosive gases. 

c)

 

This unit must be installed and wired in accordance with National Electrical Code, ANSI/NFPA 70. 

d)

 

Over current protection for the battery must be provided externally. To reduce the risk of fire, connect to a circuit provided with 30 amperes maximum 
branch-circuit over current protection in accordance with National Electrical Code, ANSI/NFPA 70. 

e)

 

Over current protection for the auxiliary load control output or auxiliary battery charge output must be provided externally. To reduce the risk of fire, 
connect to load or auxiliary battery with 30 amperes maximum over current protection in accordance with National Electrical Code, ANSI/NFPA 70. 

f)

 

Insure that unit is properly configured for the battery being charged. 

g)

 

This unit is not water tight. Do not expose to rain, snow or excessive moisture. 

h)

 

Insure all terminating connections are clean and tight. Battery, PV and Auxiliary Output terminals are to be tightened to 9 in-lb (1 nm). IPN Network and 
battery temperature sensor compression terminals are to be tightened to 2.1 in-lb (0.24 nm).  

i)

 

Do not connect to a PV array capable of producing greater than 20 amperes of short circuit current @ STC. 

j)

 

This unit is not provided with a GFDI (ground-fault detector/interrupter) device and must be used with an external GFDI device as required by Article 690 
of National Electrical Code for the installation location. 

 

5.  PREPARING TO CHARGE 

a)

 

Never charge a frozen battery. 

b)

 

Be sure battery is mounted in a well ventilated compartment. 

c)

 

Add distilled water in each cell of a lead-acid battery until battery acid reaches level specified by battery manufacturer.  

Содержание Solar Boost 2512i

Страница 1: ...IC CHARGE CONTROLLER INSTALLATION AND OPERATION MANUAL THIS MANUAL INCLUDES IMPORTANT SAFETY INSTRUCTIONS FOR MODELS SB2512i and SB2512iX SAVE THESE INSTRUCTIONS COVERED UNDER ONE OR MORE OF THE FOLLOWING US PATENTS 6 111 391 x 6 204 645 Blue Sky Energy Inc 2011 430 0021 E ...

Страница 2: ...LLATION 5 Electrostatic Handling Precautions 6 Selecting PV Modules 6 As Shipped Factory Default Settings 6 Equalize Enable 6 Battery Temperature Sensor 6 Battery and PV Wiring 7 Auxiliary Output 10 Auxiliary Battery Charge 8 Load Controller 8 Dusk to Dawn Lighting Control 8 Installing a Multi Controller System 8 Multi Controller Wiring And Setup 8 IPN Network Address 9 Mounting 9 TROUBLESHOOTING ...

Страница 3: ...battery can produce a short circuit current high enough to weld a ring or the like to metal causing a severe burn j Remove all sources of power photovoltaic and battery before servicing or installing 4 CHARGER LOCATION INSTALLATION a This unit is designed to charge 12V 6 cell flooded or sealed type lead acid chemistry batteries within the range of 20 to 10 000 amp hours Follow battery manufacturer...

Страница 4: ...oller coordination x Auxiliary Output for load lighting control or auxiliary battery charge PART NUMBERS AND OPTIONS x SB2512i Basic Solar Boost 2512i charge controller x SB2512iX Full featured Solar Boost 2512iX charge controller x IPNPRO IPN ProRemote display battery monitor x IPNPRO S IPN ProRemote with required 500A 50mV current shunt x CS 500 500A 50mV current shunt x IPNREM IPN Remote displa...

Страница 5: ...at charge voltage setting to No Float using the IPN ProRemote Refer to the IPN ProRemote operators manual FRONT PANEL INDICATORS FIGURE 1 EQUALIZATION Omitted on SB2512i WARNING Not all batteries can be safely equalized Equalization should be performed only on vented liquid electrolyte lead acid batteries Always follow battery manufacturers recommendations pertaining to equalization Equalization a...

Страница 6: ...e about 10 20 increase Charge current increase can go to zero in hot temperatures whereas charge current increase can easily exceed 30 with a discharged battery and freezing temperatures For a more complete MPPT description see www blueskyenergyinc com PANEL TEMPERATURE AND OUTPUT POWER Internal power control devices use the front panel as a heatsink It is normal for the front panel to become quit...

Страница 7: ...ance Select PV modules that do not exceed the maximum ratings shown below and preferably produce at least 3A of IMP per 100 amp hours of battery capacity Recommended range of VMP at STC Maximum PV Power STC Maximum PV Isc STC Maximum PV VOC STC Nominal 12V PV 340W 20A 28 0V 16 5 18 5V AS SHIPPED FACTORY DEFAULT SETTINGS The 2512 contains various user configurable settings all of which are preconfi...

Страница 8: ...2 1 in lb 0 24 nm CAUTION DO NOT connect Bat and PV together outside of the unit or improper operation will result Bat and PV connect together internally SETUP AND WIRING DIAGRAM FIGURE 3 AUXILIARY OUTPUT Omitted on SB2512i The auxiliary output can serve one of three functions a 2 amp auxiliary battery charger a 25 amp load controller with Low Voltage Disconnect LVD or a 25 amp variable Dusk to Da...

Страница 9: ...n lighting control is enabled the Load output is controlled by both the normal load control function and the lighting control function such that whichever function wants the Load output OFF prevails Dusk or night time begins when the charge control system turns OFF which occurs when PV module current drops below 50mA at battery voltage Dawn or day time begins when the charge control system turns O...

Страница 10: ...ESS MASTER SLAVES DIP SWITCH 0 1 2 3 4 5 6 7 JUMPER A2 NO NO NO NO YES YES YES YES 1 A1 OFF OFF ON ON OFF OFF ON ON 2 A0 OFF ON OFF ON OFF ON OFF ON MOUNTING CAUTION Mount the 2512 vertically to promote air flow and do not enclose in a confined space The 2512 is not watertight and must be protected from rain snow and excessive moisture Take care not to place mounting screws under large brown capac...

Страница 11: ...d battery voltage is high Output during MPPT operation is constant power higher battery voltage reduces charge current increase VMP and available power decrease with increasing PV cell temperature Cooler PV s will produce greater boost It is normal for boost to decrease as PV temperature rises Replace use as is or use different controller for different PV modules Auxiliary battery not being chargi...

Страница 12: ...nt process With IPN ProRemote which may be used as specifications are subject to change without prior notice a setup tool only or permanently installed FIVE YEAR LIMITED WARRANTY Blue Sky Energy Inc hereinafter BSE hereby warrants to the original consumer purchaser that the product or any part thereof shall be free from defects due to defective workmanship or materials for a period of five 5 years...

Отзывы: