A.
Introduction
1.
GENERAL INFORMATION
Congratulations on purchasing a high-quality BlueNova® product.
2.
DOCUMENT SCOPE
This is a technical support document applicable to the following product(s):
-
BlueNova® CPS 5000-Vic 5.2k
The information in this document includes the following
-
Product Assembly & Installation Procedures
-
Operating Instructions
-
Maintenance & Troubleshooting Guidelines
-
Emergency Procedures
3.
TERMINOLOGY
The table below contains an alphabetical list of industry-specific abbreviations as well as
product-specific terms used throughout this document:
Term
Definition
AC
(abbr.)
Alternating Current
(as supplied by utilities & most generators).
Battery
(term)
A product subcomponent, in this case specifically 1 x
BN52V-100-
5.2k DU (Daily Use)
Lithium Iron Phosphate battery.
See:
G. Supporting Documents
for more technical information.
Battery Pack
(term)
Two or more
BN52V-100-5.2k DU
batteries connected to each other
in parallel, up to a maximum of 9.
BMS
(abbr.)
Battery Management System
: Battery-integrated electronic circuitry
& components. Supports cell health, product safety & peripheral
compatibility functionalities.
DB
(abbr.)
Electrical
Distribution Board
.
Site DB
refers to the main electrical distribution board (if available)
of the building or site at which the product will be installed.
DB-A
or
DB-B
refers to either one of the two electrical distribution
boards integrated as subcomponents within the CPS5000 system
(see:
C. Structural Information - 1. Product Layout
)
DC
(abbr.)
Direct Current
. Batteries & solar panels supply DC.
DoD
(abbr.)
Depth of Discharge
. Refers to a percentage of the total available
energy capacity of a battery or battery pack.
Содержание CPS 5000-King
Страница 1: ...Installation Manual CPS 5000 Vic 5 2k...