background image

2.

 

WARRANTY REQUIREMENTS 

 
 

This product consists of various subcomponents, some of which include individual 
warranties supplied by the manufacturer and/or distributor in each case. Please see  

G. Supporting Documents 

for

 

full documentation of

 

BlueNova product & workmanship 

warranties, as well as third-party supplier warranties. 

 

 
IMPORTANT:

 

The application for which this product is installed 

might

 require integration 

with existing on-site electrical systems and/or components. Depending on the extent of 
such installations, a 

Certificate of Compliance

 might have to be obtained following 

completion of such installations, as per South African legislature. CoC documents issued in 
this regard should be kept safe & will be supportive in the event of future warranty claims. 
For installations outside the borders of South Africa, any local legislative requirements 
and/or laws comparable to the above should also be adhered to, following installation, 
especially if some similar form of certification can be obtained. 

 

 

C.

 

Structural Information 

 

1.

 

PRODUCT LAYOUT 

 

A CPS 5000-Vic 5.2k system consists of 2 x main wall-mountable sections. 
The top section consists of a backboard which houses the inverter, distribution boards & 
output socket sets, while the bottom section consists of a bracket supporting a LiFePO4 
battery: 
 

 

Содержание CPS 5000-King

Страница 1: ...Installation Manual CPS 5000 Vic 5 2k...

Страница 2: ...EMENTS C STRUCTURAL INFORMATION 1 LIST OF COMPONENTS 2 PRODUCT LAYOUT D INSTALLATION 1 PRE INSTALLATION 1 1 Product Applications 1 2 Requirements Limitations 1 3 Wiring Diagram 2 STANDARD INSTALLATION...

Страница 3: ...V 100 5 2k DU Daily Use Lithium Iron Phosphate battery See G Supporting Documents for more technical information Battery Pack term Two or more BN52V 100 5 2k DU batteries connected to each other in pa...

Страница 4: ...importance that any all requirements listed below are strictly adhered to Product installation maintenance should be performed by a qualified electrical installer or authorised BlueNova representative...

Страница 5: ...have to be obtained following completion of such installations as per South African legislature CoC documents issued in this regard should be kept safe will be supportive in the event of future warra...

Страница 6: ...The distribution boards in the top section contain the following components The diagram below illustrates the layout of the unit s BN52V 100 5 2k DU battery...

Страница 7: ...at the product integrated inverter is compatible by design with several peripheral hardware components A few applications for which the product can be configured are described below Product Applicatio...

Страница 8: ...figured for such purposes Please see D3 Adding Solar below Familiarising yourself with system subcomponents minimises the risk of failure during product installation For non standard applications of t...

Страница 9: ...l the rawl bolts supplied The top section should be mounted as high as possible without compromising access to the inverter s user interface and or legibility of any information that might be displaye...

Страница 10: ...verter will auto disconnect At temperatures higher than 25 C maximum inverter output will derate to less than 4000W See the inverter manual included with shipment for more information The AC breakers...

Страница 11: ...4 ADDING MORE BATTERIES Additional batteries can be connected to the original battery to increase overall capacity Batteries should be connected as illustrated below...

Страница 12: ...32 RJ11 Not active CAN Ports RJ45 x 2 Serial communication via CAN Bus PIN configuration as follows 7 CAN H 8 CAN L RS485 Ports RJ45 x 2 Pin configuration as follows 1 8 A 2 7 B 3 6 GND 4 5 NC DIP SWI...

Страница 13: ...me capacity on Flash 3 Highest LED Flash 2 OV Protect on on on on on off OC Protect charge limit off off off off off off on Stop charging Charge limit According to real time capacity on off Highest LE...

Страница 14: ...ry display If the batteries are not charged repeat steps 1 to 3 above Should the system not start up at this point please contact BlueNova technical support G Emergency First Aid 1 IN CASE OF FIRE a E...