5
INSTALLATION
UNCRATING
This range was inspected before leaving the factory. The transportation company
assumes full responsibility for safe delivery upon acceptance of the shipment.
Immediately after unpacking, check for possible shipping damage. If the range is
found to be damaged, save the packaging material and contact the carrier within 15
days of delivery.
Uncrate unit carefully and place in a work-accessible area as near to its final
installed position as possible. Remove all shipping wire and wood blocking.
Before installing, check the type of gas supply (natural or propane) to make sure
they agree with the specifications on the rating plate located on the inside of the
lower kick panel. If the supply and equipment requirements do not agree, do not
proceed with the installation. Contact your dealer or company immediately.
LOCATION
The appliance must be installed under a ventilation hood.
The equipment area must be kept free and clear of combustible substances.
The range, when installed, must have a minimum clearance from combustible
construction of 12" (304 mm) at the sides and 10" (253 mm) at the rear. Clearance from
non-combustible construction is 0" at the sides and 6" (152 mm) at the rear.
The installation location must allow adequate clearances for servicing and proper
operation. A minimum front clearance of 40" (1016 mm) is required.
The range must be installed so that the flow of combustion and ventilation air will not
be obstructed. Adequate clearance for air openings into the combustion chamber
must be provided. Make sure there is an adequate supply of air in the room to allow
for combustion of the gas at the burners.
INSTALLATION CODES AND STANDARDS