background image

EXPLODED VIEW & PARTS LIST

HOT WATER TANK ASSEMBLY

18

68

56

57

56

61

50

52

55

66

66a

13

66b

59

60

14

ALTERNATE

50

2

6

2

6
54

67

58

IL1715

N

O

 

D

E

S

U

N

O

I

T

P

I

R

C

S

E

D

.

O

N

 

T

R

A

P

M

E

T

I

13

2C-70134

HOLD-DOWN STRAP

BOTH SIDES

14

2C-73457

NUT, HEX 8-32 KEPS 

BOTH SIDES

50

WS-8512-51

THERMOSTAT (BLACK BODY - INCL. SEAL & MOUNTING SCREWS)

BOTH SIDES

WS-86280

THERMO (ALT) (GRAY BODY - INCL. TUBE & MOUNTING SCREWS)

S

E

D

I

S

 

H

T

O

B

)

Y

L

N

O

E

B

U

T

 

P

A

C

 

O

M

R

E

H

T

 ,

R

E

H

S

A

W

 L

A

E

S

4

7

1

0

7

-

C

2

2

5
54

2I-70147

TANK COVER GASKET

BOTH SIDES

55

2C-70175

NUT HEX 1/2-20 BRASS

BOTH SIDES

S

E

D

I

S

 

H

T

O

B

L

I

O

C

 

R

E

T

A

W

 

R

O

 

T

N

E

M

E

L

E

 ,

T

E

K

S

A

G

 L

A

E

S

2

5

1

0

7

-I

2

6

5

Y

L

N

O

 

E

D

I

S

 

T

H

G

I

R

S

S

A

R

B

 

0

2

-

6

1

/

7

 

X

E

H

 

T

U

N

1

5

1

0

7

-

C

2

7

5
58

2N-70149

HOT WATER COIL

RIGHT SIDE ONLY

S

E

D

I

S

 

H

T

O

B

 

 

 

 

ELBOW, INLET

Z18254

-

K

2

9

5
60

2V-70102

TUBE, VENT, SILICONE

BOTH SIDES

S

E

D

I

S

 

H

T

O

B

E

N

O

C

I

L

I

S

 ,

T

E

L

T

U

O

 

K

N

A

T

 ,

W

O

B

L

E

3

0

1

0

7

-

K

2

1

6

62

E

D

I

S

 

T

F

E

L

S

E

L

O

H

 

6

 ,

Y

L

N

O

 

E

T

A

L

P

 ,

R

E

V

O

C

 

N

A

T

1

2

2

0

7

-

6

A

E

D

I

S

 

T

H

G

I

R

S

E

L

O

H

 

8

 ,

Y

L

N

O

 

E

T

A

L

P

 ,

R

E

V

O

C

 

N

A

T

2

4

1

0

7

-

6

A

66

2V-70144

WATER INLET TUBE

BOTH SIDES

66a

2C-70146

NUT, HEX 4-40 SS

BOTH SIDES

S

E

D

I

S

 

H

T

O

B

D

A

E

H

 

N

A

P

 

1

 x

 

0

4

-

4

 

W

E

R

C

S

5

4

1

0

7

-

C

2

b

6

6

67

2

9

7

8

 ,

0

9

7

8

)

W

0

0

0

2

 ,

V

0

2

1

T

N

E

M

E

L

E

 

G

N

I

T

A

E

H

L

U

5

0

0

1

7

-

N

2

3

9

7

8

 ,

1

9

7

8

)

W

0

0

5

3

 ,

V

0

4

2

T

N

E

M

E

L

E

 

G

N

I

T

A

E

H

L

U

5

1

7

0

7

-

N

2

68

2D-70110

TANK BODY

BOTH SIDES

TANK COVER ASSEMBLY 

DD-8549WF-300

INCLUDES: MOUNTED THERMO, 120V 2000W HEATING ELEMENT & HOT WATER COIL)

8790, 8792

WS-8716-300

INCLUDES: MOUNTED THERMO, 230V 3800W HEATING ELEMENT & HOT WATER COIL)

8791, 8793

625 p/n 2M-75873 8792, 8793 Dual Coffee Brewer

Содержание GOURMET 1000 8792

Страница 1: ...ER MODEL 8792 Includes Installation Operation Use Care Servicing Instructions 2060 Cessna Dr Suite 100 Vacaville CA 95688 telephone 707 448 5151 fax 707 448 1521 www bloomfieldworldwide com Model 8792...

Страница 2: ...pensers i e tea and coffee carry a 90 days parts warranty only excludes decanters c decanters are not covered by this warranty THE FOREGOING OBLIGATION IS EXPRESSLY GIVEN IN LIEU OF ANY OTHER WARRANTI...

Страница 3: ...RMATION 3 INSTALLATION INSTRUCTIONS 4 OPERATION 6 BREWING COFFEE 8 CLEANING INSTRUCTIONS 9 TROUBLESHOOTING SUGGESTIONS 10 SERVICING INSTRUCTIONS 11 16 EXPLODED VIEWS PARTS LISTS 18 WIRING DIAGRAMS 22...

Страница 4: ...BREW CHAMBERS REMOVED BREW NOZZLE SPRAY HEAD GASKET TIMER ACCESS SPRAY DISK AIRPOT BREWER AIRPOT BREWING POSITION BREW CHAMBER BREW SWITCH READY TO BREW LIGHT POUR OVER OPENING POUR OVER COVER HOT WAT...

Страница 5: ...appliance use limitations and associated hazards Operating instructions and warnings must be read and understood by all operators and users Except as noted this piece of equipment is made in the USA a...

Страница 6: ...sure between 20 PSI and 90 PSI If your water pressure exceeds 90 PSI at anytime a pressure regulator must be installed in the water supply line to limit the pressure to not more than 90 PSI in order t...

Страница 7: ...LQH EHWZHHQ WKH EDFN RZ SUHYHQWHU DQG WKH brewer inlet as far away from the brewer as space will allow 7KLV ZLOO UHOLHYH WKH H FHVVLYH EDFN SUHVVXUHV WKDW FDQ FDXVH faucet leaks and solenoid malfuncti...

Страница 8: ...out 3 full 64 oz decanters of water per side Once both tanks are full of water connect the brewer to electrical power The heating elements will begin heating the water in the WDQN KHQ WKH ZDWHU KDV UH...

Страница 9: ...water tank This forces an identical amount of hot water out of the tank and through the spray head into the brew chamber 7KH VROHQRLG XVHV D RZ FRQWURO GHYLFH VR WKDW RZ LV FRQVLVWHQW EHWZHHQ S V L DQ...

Страница 10: ...ap water Lift the pour over cover and pour the entire contents of the FRQWDLQHU LQWR WKH SRXU RYHU RSHQLQJ ZKLFK ZLOO OO WKH EDVLQ Water from the basin will displace a like amount of heated water from...

Страница 11: ...rm water and a mild detergent A bristle brush may be used to clean the inside Rinse with clean water and allow to air dry Wipe the exterior of the brewer with a soft clean cloth or sponge moistened wi...

Страница 12: ...WHU per brew Brew chamber dispense hole plugged Thoroughly clean brew chamber Too much cofIHH RU WRR QH D JULQG Adjust coffee amount and grind Sprays water from brew head Spray gasket improperly insta...

Страница 13: ...held by two screws at the bottom and a retaining lip at the top SOLENOID DOOR Remove solenoid door to access solenoid plumbing connections Each solenoid door is held by two screws and a retaining lip...

Страница 14: ...CAUTION SHOCK HAZARD These procedures involve exposed electrical circuits These procedures are to EH SHUIRUPHG E TXDOL HG technical personnel only NOTE Optimum brewing temperature range is 195 F to 20...

Страница 15: ...EMOVE TANK LID ASSEMBLY 8QSOXJ EUHZHU RU WXUQ FLUFXLW EUHDNHU OFF Turn OFF water supply 5HPRYH WRS SDQHO 3XOO YHQW WXEH DQG LQOHW HOERZ RXW RI basin pan 3XOO ZDWHU LQOHW WXEH RXW RI EDVLQ SDQ 5HPRYH E...

Страница 16: ...hose to be easily slid off of the solenoid bypass outlet c Install hose on new valve by pressing end of hose onto bypass outlet until it is fully seated Disconnect wiring Remove two screws holding sol...

Страница 17: ...FHSW ZKHQ IDXFHW YDOYH LV WXUQHG 2 5HPRYH WDQN OLG DVVHPEO SHU DERYH 5HPRYH WZR KH QXWV KRW ZDWHU FRLO WR FRYHr Pull coil from mounting holes 5HDVVHPEOH LQ UHYHUVH RUGHr REPAIR HOT WATER FAUCET 5HPRYH...

Страница 18: ...up Empty all water from the tank Set the tank back into the brewer 4 Mix 2 quarts of deliming solution according to the manufac turer s directions Carefully pour the deliming solution into the water...

Страница 19: ...49 HOT WATER COIL RIGHT SIDE ONLY S E D I S H T O B ELBOW INLET Z18254 K 2 9 5 60 2V 70102 TUBE VENT SILICONE BOTH SIDES S E D I S H T O B E N O C I L I S T E L T U O K N A T W O B L E 3 0 1 0 7 K 2 1...

Страница 20: ...1 0 7 C 2 7 2 E D I S T H G I R S S 6 1 1 x 8 1 1 x 2 3 5 1 T A L F R E H S A W 1 8 6 2 7 C 2 8 2 29 WS 82556 FAUCET ASSEMBLY PRESSURE RIGHT SIDE 33 2I 70139 GASKET SPRAY HEAD ALL 34 A6 72727 SPRAY D...

Страница 21: ...RIGHT SIDE 2E 75754 SOLENOID SINGLE 120V 50 GPM LEFT SIDE 2E Z16608 SOLENOID BYPASS 120V 30GPM 8792AF 240V 2E Z16741 SOLENOID SINGLE 120V 30GPM 8792AF 240V 50 WS 812 51 T STAT BLACK GRAY BODY INCL SEA...

Страница 22: ...TH 72 Support Lower BOTH 73 2A 71732 LEG ASSEMBLY LEVELLING BOTH 75 2K 70229 BUSHING HEYCO BOTH 101 ASSEMBLY BODY BOTH 102 FRONT PANEL BOTH 104 2Q 75089 DOOR SOLENOID ACCESS PLASTIC BOTH 105 2F 76666...

Страница 23: ...WIRING DIAGRAM 22 p n 74810 625 p n 2M 75873 8792 8793 Dual Coffee Brewer...

Страница 24: ...2060 Cessna Dr Suite 100 Vacaville CA 95688 phone 707 448 5151 fax 707 448 1521 www bloomfieldworldwide com...

Отзывы: