SERVICING INSTRUCTIONS (continued)
10. Reinstall tank lid assembly into hot water tank. Make sure
the lid gasket is properly in place, then reinstall the hold-
down clamps.
11. Remove spray disks and gaskets. Rinse both brew heads
with clean water. Using a stiff brush, scrub spray disk to
remove any lime or calcium build-up. Reinstall gaskets
and spray disks.
13. Reconnect brewer to electrical supply .
14. Install the brew chamber without filter paper or grounds.
15. Place an empty satellite under the brew chamber. Run at
least five 1-1/2 gallon brew cycles and discard all water
generated at the end of each cycle.
Repeat for the other side.
16. Rinse satellite with clean water. Reinstall one empty
satellite under each brew chamber.
Brewer is ready to use.
DRAINING HOT WATER TANK
1. Disconnect brewer from the electrical supply
2. Remove the top panel assembly (4 Screws)
3. Remove the front panel assyembly (4 Screws)
4. Release the drain hose & hose clamp assy from the retaining
clip.
5. Bring the drain hose down out the front panel so its lower
than the tank.
6. Remove the red hose cap.
6. Open the hose clamp and drain into container.
CAUTION:
Tank holds 6 gallons of water and can may contain
HOT WATER,
7. When tank is empty, close the hose clamp and place the red
cap back into position.
8. Place the end of the hose back into its retaining clip
NOTE:
Normally, silicone
hoses do not need to be
delimed. Should deliming hoses
become necessary, Bloomfield
recommends replacing the
hoses.
13
671 2M-Z16955 Owners Manual 9221 Dual Satellite Brewer
671 2M-Z16955 Owners Manual 9221 Dual Satellite Brewer
Содержание 9121
Страница 22: ...EXPLODED VIEW 9221 INTERIOR COMPONENTS 20 671 2M Z16955 Owners Manual 9221 Dual Satellite Brewer IL2310 PL671 ...
Страница 31: ...NOTES 29 671 2M Z16955 Owners Manual 9121 9221 Dual Satellite Brewer ...
Страница 32: ...10 Sunnen Drive St Louis MO 63143 telephone 314 678 6336 fax 314 781 2714 www wellsbloomfield com ...