background image

INSTALLATION 

READ THIS CAREFULLY BEFORE STARTING THE INSTALLATION

 

Unpack the unit.  Inspect all components for completeness and 
condition.  Ensure that all packing materials have been removed 
from the unit.  

 
Verify that the Spray Head Gasket and Spray Disk are properly 
installed.   

 

 
LEVELING THE UNIT 

 

Verify that an adjustable leg is installed at each corner of the 
brewer. 

 
Set Brewer in its operating location.  Level the Brewer.  A spirit 
level should be placed on the top of the unit, at the edge, as a 
guide when making level adjustments. 

 
Level the unit from left to right and front to back by turning the  
adjustable feet.  Be sure all four feet touch the counter to prevent 
tipping. 
 

PLUMBER’S INSTALLATION INSTRUCTIONS  

 
IMPORTANT: This equipment must be installed to comply  
with all applicable federal, state and  local plumbing codes and            
ordinances;  specifically: 
The Basic Plumbing Code of Building Officials and Code           
Administrators International, Inc. (BOCA) and the Food Service 
Sanitation Manual of the Food and Drug Administration (FDA). 
 
Brewer should be connected to a 

POTABLE WATER, COLD 

WATER

 line.  Flush water line before connecting to Brewer.  

 

 

DO NOT use a saddle valve with a self-piercing tap for the water 
line connection.  Such a tap can become restricted by waterline 
debris.  For systems that must use a saddle tap,  shut off the main 
water supply and drill a 3/16” (minimum) tap for the saddle     
connection, in order to insure an ample water supply.  Remember 
to flush the line prior to installing the saddle. 

 
The brewer must be installed on a water line with average     
pressure between 20 PSI and 90 PSI.  If your water pressure   
exceeds 90 PSI at anytime, a pressure regulator must be 
installed in the water supply  line to limit the pressure to not more 
than 90 PSI in order to avoid damage to lines and solenoid. 

 
A water shut-off valve should be installed on the incoming water 
line in a convenient location (Use a low restriction type valve, 
such as a 1/4-turn ball valve, to avoid loss of water flow thru the 
valve. 

IMPORTANT: 

To enable the installer to make 
a quality installation and to  
minimize installation time, the 
following suggestions and tests 
should be done before the     
actual unit installation is started: 

 

 
CAUTION:

  

Equipment 

Electrical Damage 

 

DO NOT plug in or energize this 
appliance until all Installation 
Instructions are read and       
followed.  Damage to the 
Brewer will occur if these 
instructions are not followed. 
 

 

CAUTION: Unstable 
Equipment Hazard 
 

It is very important for safety 
and for proper operation that the 
brewer is level and stable when 
standing in its final operating 
position.  Provided adjustable, 
non-skid legs must be installed 
at each corner of the unit.    
Failure to do so will result in 
movement of the brewer which 
can cause personal Injury and/
or damage to brewer. 
 
 

NOTE:

  Water supply inlet line 

must meet certain minimum 
criteria to insure successful 
operation of the brewer. 
Bloomfield recommends 1/4" 
copper tubing for installation of 
less than 12 feet and 3/8" for 
more than 12 feet from a 1/2" 
water supply line.  

 

 

 
 

Содержание 1016BVM

Страница 1: ...12821 M912 050210 cps 912 OWNERS MANUAL for E B C Electronic Brew Control COFFEE BREWERS MODEL 1016BVM Includes Installation Operation Use Care Servicing Instructions This instruction is for the excl...

Страница 2: ...coffee carry a 90 days parts warranty only excludes decanters THE FOREGOING OBLIGATION IS EXPRESSLY GIVEN IN LIEU OF ANY OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING ANY IMPLIED WARRANTY OF MERCHAN...

Страница 3: ...This manual contains the information needed to properly install this appliance and to use care for and maintain or repair the appliance in a manner which will ensure its optimum performance WARRANTY...

Страница 4: ...1016BVM FEATURES AND OPERATING CONTROLS 2 Fig 1 1016BVM Features and Operating Controls...

Страница 5: ...nts This appliance is intended for use in commercial establishments where all operators are familiar with the appliance use limitations and associated hazards Operating instructions and warnings must...

Страница 6: ...sure an ample water supply Remember to flush the line prior to installing the saddle The brewer must be installed on a water line with average pressure between 20 PSI and 90 PSI If your water pressure...

Страница 7: ...receptacle The water line must terminate in a 1 4 male flare fitting which will connect to the provided flex line See Figure 2 below In some areas local codes require a backflow preventer check valve...

Страница 8: ...sounding 3 Be sure the brewer is OFF if necessary press ON OFF key until no LEDs are lit 4 Press BREW key three 3 times then press CANCEL key once BREW and HEAT indicators will flash while tank is fi...

Страница 9: ...y energizes the solenoid valve allowing water from an external water supply to flow into the water tank The incoming water forces heated water out of the tank to perform the brew The solenoid uses a f...

Страница 10: ...w cycle three beeps will sound NOTE To override Brew Waiting Mode press and hold the BREW key for 3 seconds while the BREW indicator is flashing Brew will begin regardless of water temperature To avoi...

Страница 11: ...able Enable After Hours Feature To disable After Hours press the ON OFF key to turn the brewer OFF Press and hold the CANCEL key until two beeps sound and the HEAT indicator flashes twice This feature...

Страница 12: ...sh coffee grounds Gently shake the brew chamber to level the bed of grounds Slide the brew chamber into place under the brew head B AUTOMATIC OPERATION BE sure HEAT light is not lit Place the appropri...

Страница 13: ...ter and allow to air dry 7 Wash the brew chamber in a sink using warm water and a mild detergent A bristle brush may be used to clean the inside Rinse with clean water and allow to air dry 8 Wipe warm...

Страница 14: ...ed Thoroughly clean brew chamber Too much coffee or too fine a grind Use correct grind and amount of coffee Sprays water from brew head Spray gasket improperly installed Check reinstall gasket on INSI...

Страница 15: ...unplug brewer and replace temp probe Check power board and heating element Brewer will go into error mode 4 minutes after energizing the heating element if insufficient heat rise is detected The heati...

Страница 16: ...ng Top panel is held by two screws at the front and a retaining lip at the rear FRONT PANEL Remove upper front panel to access controller power board and solenoid Upper front panel is held by two scre...

Страница 17: ...ewing temperature based on altitude Upon completion remove thermometer and reinstall the plug or vent tube Fig 13 Checking and Adjusting Brew Temperature CAUTION Electric Shock Hazard These procedures...

Страница 18: ...as coffee The time between the end of a brew and when a new brew can be initiated is controlled by the BREW SIGNAL TIMER Adjust the BREW SIGNAL TIMER dial on the controller to account for the dripout...

Страница 19: ...et coil also replace seal gaskets Remove tank lid assembly per above Remove two hex nuts hot water coil to cover Pull coil from mounting holes REPAIR HOT WATER FAUCET Remove top panel and turn faucet...

Страница 20: ...ERS Slide jumper over both pins of V1 to set VALVE TIME range at 60 180 seconds Remove jumper from V1 to set VALVE TIME range at 120 250 seconds REPLACE KEYPAD Unplug power cord Shut off water supply...

Страница 21: ...n pull tank from cabinet to allow access to board Note position of wires at power board then remove wires Suggestion Marking these wires is highly recommended to ease reinstallation Remove screws hold...

Страница 22: ...sh Large Sink or other appropriate work area 1 Unplug power cord Turn off the water shut off valve and disconnect the water supply line from the brewer inlet fitting 2 Remove the tank lid assembly as...

Страница 23: ...nternal components are dry then reinstall the top panel 10 Reconnect brewer to electrical supply and reconnect water supply 11 Install the brew chamber without filter paper or grounds Run at least thr...

Страница 24: ...EXPLODED VIEW PARTS LIST continued 22...

Страница 25: ...6 8552 18 TERMINAL BLOCK 1 37 8716 1 ELEMENT TANK 240V 3500W 1 38 8552 50 THERMOSTAT HI LIMIT RESET 1 39 8706 65 SCREW PAN PHL 6 23x7 8 SS 2 40 83319 PLUG TANK LID 298 DIA 41 8706 76 PLUG BUTTON 1 1 8...

Страница 26: ...Cup 12d Spring 12h Stem 12j Pin 12k Bonnet 82682 Retainer Clip item 12b 84804 Aerator Replacement Kit Includes 12e O Ring 12f Aerator Disk 12g Aerator Cap 84870 Aerator Repair Kit Includes 12e O Ring...

Страница 27: ...1016BVM WIRING DIAGRAM 25...

Страница 28: ...tries Inc Division of Carrier Commercial Refrigeration In US and Canada Telephone 775 689 5700 Fax 888 492 2783 Fax 800 356 5142 website www wellsbloomfield com for orders only Bloomfield Industries p...

Отзывы: