6
INSTALLATION
Installation Instructions
1. Select a location to provide drainage directly below
the tangent draw-off. Allow sufficient rear clearance
from wall for kettle cover to lift upright freely and com-
pletely without obstructions.
2.
Mark hole locations through flanged adjustable feet
on KLT-__E models. Remove kettle.
3. Drill holes on marked hole locations, and insert ex-
pansion shields to accommodate 5/16” size lag bolts.
4. Reposition kettle. On KLS-__E models level by mak-
ing necessary adjustments on flanged feet.
5.
Bolt down kettle and seal with Silastic or other equiv
-
alent sealing compound. Sealant must be applied not
only to bolt heads but also around flanges or pedestal
base making contact with floor surface to fulfill NSF
requirements. Wipe off excess sealant immediately.
6.
A control box with power supply equivalent to electri
-
cal
7. Rating of kettle should be located conveniently near-
by.
8. A waterproof electrical connection for power supply to
rear of control housing must be provided.
9. Ground kettle to terminal provided inside control
housing.
10. Turn power ON and check for proper operation.