background image

S

SA

AF

FE

ET

TY

Y W

WA

AR

RN

NIIN

NG

G

Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and
air-conditioning equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered
equipment by an unqualified person could result in death or serious injury. When working on the equipment, observe all precautions in the
literature and on the tags, stickers, and labels that are attached to the equipment.

August 2017

A

AC

CC

C--S

SV

VN

N9

91

1G

G--E

EN

N

Electric Heaters

Split System Air Handlers, 5-25 Ton

B

BA

AY

YH

HT

TR

RL

L: Used with TWE051,

TWE060, TWE072, TWE076,
TWE090, TWE101, TWE120,
TWE126
B

BA

AY

YH

HT

TR

RM

M: Used with TWE126,

TWE150, TWE156, TWE180,
TWE201, TWE240, TWE251,
TWE300

Installation Guide

Содержание BAYHTRL

Страница 1: ...uipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in the literature and on the tags stickers and labels that are attached to the equipment August 2017 A AC CC C S SV VN N9 91 1G G E EN N Electric Heaters Split System Air Handlers 5 25 Ton B BA AY YH HT TR RL L Used with TWE051 TWE060 TWE072 TWE076 TWE090 TWE101 TWE120 TWE...

Страница 2: ...jo ob b b be ei in ng g u un nd de er rt ta ak ke en n c co ou ul ld d r re es su ul lt t i in n d de ea at th h o or r s se er ri io ou us s i in nj ju ur ry y T Te ec ch hn ni ic ci ia an ns s i in n o or rd de er r t to o p pr ro ot te ec ct t t th he em ms se el lv ve es s f fr ro om m p po ot te en nt ti ia al l e el le ec ct tr ri ic ca al l m me ec ch ha an ni ic ca al l a an nd d c ch he e...

Страница 3: ...l li ic ci ie es s c ca an n b be e f fo ou un nd d o on n t th he e B BO OS S s si it te e W Wh he er re e l lo oc ca al l r re eg gu ul la at ti io on ns s a ar re e m mo or re e s st tr ri in ng ge en nt t t th ha an n t th he es se e p po ol li ic ci ie es s t th ho os se e r re eg gu ul la at ti io on ns s s su up pe er rs se ed de e t th he es se e p po ol li ic ci ie es s N No on n I In ng ...

Страница 4: ...4 ACC SVN91G EN Pre Installation 5 Inspection 5 General 5 Parts List 5 Installation 6 Low Voltage Wires 24 Volts 6 High Voltage Wires 7 Wiring Diagrams 10 Table of Contents ...

Страница 5: ... clamps 2 screws for cable clamp 2 bullet wire ties 4 regular wire ties 1 plastic bushing 11 screws for the L series heaters 20 screws for the M series heaters 1 gasket Table 1 Heater compatibility L and M series Unit Model Voltage a b Phase Heaters L Series TWE060 1 208 230 1 ph BAYHTRL106A 112A 117A 123A TWE060 3 208 230 3 ph BAYHTRL305A 310A 315A 325A TWE051 TWE060 4 380V 50Hz 460V 60Hz 3 ph BA...

Страница 6: ...ge on top of the air handler Retain screws and flange for optional installation on top of the heater See Figure 1 p 6 and Figure 2 p 6 2 Remove the control wire knockout Knockout 1 from top of air handler and insert plastic bushing supplied with heater This knockout will also be used if single point power entry is utilized I Im mp po or rt ta an nt t For ventilation purposes Heaters L112A L117A L1...

Страница 7: ... be hard wired to the bottom contacts of the air handler contactor per the wiring diagram for the standard air handlers For the 2 speed VFD and SZVAV the wires connect to the fuse block I Im mp po or rt ta an nt t When the dual point power entry option is used the high voltage wires for single point power entry should remain capped coiled up and clamped inside the heater control box 4 When using d...

Страница 8: ...ection device values 2 For single point power entry option heater blower motor see the heater installed nameplate on the air handler for MCA and over current protection device values 3 When electric heater accessory is used single point power entry or dual point power entry is field optional Single point power entry option is through electric heater only I In ns st ta al ll la at ti io on n ...

Страница 9: ...ction device values 2 For single point power entry option heater blower motor see the heater installed nameplate on the air handler for MCA and over current protection device values 3 When electric heater accessory is used single point power entry or dual point power entry is field optional Single point power entry option is through electric heater only I In ns st ta al ll la at ti io on n ...

Страница 10: ...10 ACC SVN91G EN Wiring Diagrams The following diagrams can be accessed through e Library or a local sales office Figure 6 BAYHTRL106A 4367 0380 ...

Страница 11: ...ACC SVN91G EN 11 Figure 7 BAYHTRL112A 4367 0381 W Wi ir ri in ng g D Di ia ag gr ra am ms s ...

Страница 12: ...12 ACC SVN91G EN Figure 8 BAYHTRL117A 4367 0324 W Wi ir ri in ng g D Di ia ag gr ra am ms s ...

Страница 13: ...ACC SVN91G EN 13 Figure 9 BAYHTRL123A 4367 0382 W Wi ir ri in ng g D Di ia ag gr ra am ms s ...

Страница 14: ...14 ACC SVN91G EN Figure 10 BAYHTRL129A 4367 0383 W Wi ir ri in ng g D Di ia ag gr ra am ms s ...

Страница 15: ...ACC SVN91G EN 15 Figure 11 BAYHTRL305A 310A 4367 0369 W Wi ir ri in ng g D Di ia ag gr ra am ms s ...

Страница 16: ...16 ACC SVN91G EN Figure 12 BAYHTRM430 W30 4367 0386 W Wi ir ri in ng g D Di ia ag gr ra am ms s ...

Страница 17: ...ACC SVN91G EN 17 Figure 13 BAYHTRM450 W50 4367 0385 W Wi ir ri in ng g D Di ia ag gr ra am ms s ...

Страница 18: ...18 ACC SVN91G EN Figure 14 BAYHTRM350 4367 0348 W Wi ir ri in ng g D Di ia ag gr ra am ms s ...

Страница 19: ...ACC SVN91G EN 19 Figure 15 BAYHTRM330 4367 0384 W Wi ir ri in ng g D Di ia ag gr ra am ms s ...

Страница 20: ...nd protect food and perishables and increase industrial productivity and efficiency We are a global business committed to a world of sustainable progress and enduring results ingersollrand com Ingersoll Rand has a policy of continuous product and product data improvements and reserves the right to change design and specifications without notice We are committed to using environmentally conscious p...

Отзывы: