background image

 

• Any cycle can be manually terminated before the normal. 
• Any cycle can use the insert probes (up to 3), they measure the internal temperature of the 

product. 

• During the Cycle there are no defrosts and the fans are always on, a defrost cycle can be done 

before any freezing cycle. 

• The cycle is divided up to 3 phases completely configurable by the user. 
• Each instrument is provided with an output for remote display XR REP, which shows the 

temperature of cabinets or goods. 

• The controller is provided with internal real time clock and can be connected to the printer. This 

means that a report, which includes all the main features of cycle, can be printed: start and end 
of the cycle, length of the cycle, logging of the temperature of the cabinet and goods. 

 

 

Frontal panel

 

 

 

 

Quick start

 

 

1.  DISPLAY 
 
The upper display 

shows the temperature of the room probe. 

The lower display 

shows the temperature of the inserts probe or the count down timer. To pass 

to the one insert probe to the another one use the DOWN key. 

                                                                                 

- Temperature. 

- Timer or insert probe 

- Alarm and status icons. 

                                                                                    If an icon or LED is on, the correspondent function is enabled. 

                                                                                    If an icon or LED is flashing, the correspondent function is delayed. 

 

 

2.  KEYBOARD IN STAND BY

 

 

 

HOW TO SELECT A CYCLE

Push and release the          (3) key till the   

desired cycle is selected. 

HOW TO START A CYCLE

: Push and release   

the START/STOP

         

  button (2). Il The   

correspondent yellow LED is switched on.. 

Содержание BCF20

Страница 1: ...BLAST CHILLER Installation Operation Maintenance Manual BCF20 40 60 Models...

Страница 2: ...General use of the cabinet 3 Operation instruction for temperature controller 4 REGULAR MAINTENANCE 10 Cleaning the condenser coil 10 Cleaning the fan blade and motor 11 Cleaning the interior of unit...

Страница 3: ...n a pallet and shrink wrapped Documentation is inserted into a clear pocket located inside the unit Carefully remove the protective plastic film and cardboard from the unit exterior and from the door...

Страница 4: ...ting equipment high ambient temperature will cause the compressor to overwork leading to higher energy bills and gradual breakdown of the unit The appliance shall not be exposed to rain sun The cabine...

Страница 5: ...g period of time please unplug the unit from the outlet After unplugging the unit wait at least 10 minutes before re plugging it Failure to do so could cause damage to the compressor Do not attempt to...

Страница 6: ...ate that product should be placed in the Blast Chiller Blast Freezer within 30 minutes from completion of cooking The packaging of food and the way in which it is loaded or placed within the equipment...

Страница 7: ...all the main features of cycle can be printed start and end of the cycle length of the cycle logging of the temperature of the cabinet and goods Frontal panel Quick start 1 DISPLAY The upper display...

Страница 8: ...DING PHASE TO DISPLAY Push and release the SET key 6 the holding set point of the selected cycle is displayed for 5 sed TO MODIFY while the set point is displayed hold pushed the SET key till the HdS...

Страница 9: ...NT While SETH is displayed hold pushed the SET key till the SETH label starts flashing and LED near the SET key is turned on Use the arrow key to modify the value and the SET key to confirm it TO CONF...

Страница 10: ...following table 9 HOW TO SELECT A CYCLE 1 Push the to move among the cycles C1 C2 C3 C4 and the holding cycle The related symbol on the display will be lighted and the cycle will be selected NOTE to...

Страница 11: ...sually called hard chill soft chill freezing cycle 2 For each phase there are 3 parameters iS1 iS 2 iS 3 Set point related to the insert probes that stops the current phase rS1 rS2 rS3 set point of th...

Страница 12: ...the three insert probes reach the iS3 value the values End followed by the i1P or i2P or i3P are shown on the display Cycle ends when all the probes have reached the iS3 value A signal is generated bu...

Страница 13: ...gular basis preferably weekly Simply remove door gasket from the frame of the door soak in warm water and soap for thirty 30 minutes dry with soft cloth and replace Check door gaskets for proper seal...

Страница 14: ...ure gaskets are snapped in completely Remove gasket and wash with soap and water Check condition of gasket and Replace if necessary Clean the condenser coil Unplug unit and allow coil to defrost Make...

Страница 15: ...W D H mm wats W Load A Climate Class Container capacity in GN1 1 Chilling capacity in 90mins kg Freezing capacity in 240mins kg BCF20 HC R290 150 800 800 930 750 4 5 4 5 20 15 BCF40 HC R290 150 800 80...

Страница 16: ...Adjusting parameters on a Blizzard Blast Chiller To start the cycle press and release the key...

Страница 17: ...Pre set cycle settings...

Отзывы: