BrewCommander™
© Blichmann Engineering, LLC 2019
9
A universal mounting kit (PN: aPS-PowerCont-Mount) is available for purchase that includes a din rail and set of screws and nuts for mounting any of
our controllers and relay modules to a wall. To mount the Brew Commander
™
, the only parts from the kit that will be used are the DIN rail and the
small 8/32 set screws. Hardware for fastening the DIN rail to the wall is not included.
Steps:
1) Rewire your controller out the bottom by following the instructions given in the rewiring video on our Blichmann Engineering
™
YouTube
channel.
2) Trim the included DIN rail to be 1/8” shorter than with width of the controller.
3) Mount the DIN rail to the desired location on the wall.
4) Slide the controller onto the DIN rail using the channel on the back of the controller.
5) Install 2 of the 8/32 set screws into the top of the controller being careful not to over tighten. Stop tightening the screws once the controller can
no longer slide along the DIN rail.
WALL MOUNTING THE CONTROLLER
Hardware Required
from Mounting Kit:
4 Set Screws
DIN Rail
Set Screw
Location
Controller &
Relay Module
Shown with
DIN Rail