Page - 5 -
BLANKOM HDC-6008CI EN 2017 V1.1, RR, 12-2017
HDC 6008CI
Front:
NMS/CAS, RF Out, GbE IPTV I/O data port, opt. USB port
Rear left
Module1: 2x DVB S2 IN, 2x CI Slots (CardA bottom, Card B top), loop
…
Module2: 2x DVB S2 IN, 2x CI Slots (CardC bottom, Card D top), loop
…
Module3: 4x FTA DVB-S2 Tuner Inputs, loop outputs
…
Power switch, Fuse
…
AC IEC Power Socket
Rear right
Grounding
Installation Preparation
When you install the device, please follow the steps below. The details of the installation
will be described after this chapter. You can also refer to the rear panel printing during the
installation.
The main steps of the installation include:
Checking the possible device missing or damage during the transportation
Preparing relevant environment for installation
Installing the DVBN-S2 / IP Mux-Scrambling QAM Modulator
Connecting signal cables
Connecting communication port for WEB-IF
Be sure to avoid shortage and all cables are installed properly before use the Power-On switch.
Power cord connection
The power socket is located on the right of rear panel, and the power switch is on the left
of front panel. User can plug one end of the power cord to the socket and insert the other
end to AC power. When the device solely connects to protective ground, it should adopt
independent way, say, share the same ground with other devices. When the device adopts
united way, the grounding resistance should be smaller than 1Ω.
Caution:
Before connecting power cord to the IP QAM Modulator, user should set the
power switch to “OFF”.
Grounding Requirement
Connecting the device’s grounding rod to frame’s grounding pole with copper wire.
All function modules’ good grounding is the basis of reliability and stability of devices.
Also, they are the most important guarantee of lightning arresting and interference