© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
* All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer.
SERVICE & INTERIM BOILER WORK RECORD
It is recommended that your boiler and heating system are regularly serviced and maintained, in line with manufacturers’ instructions, and that the appropriate service /
interim work record is completed.
Service provider
When completing a service record (as below), please ensure you have carried out the service as described in the manufacturers’ instructions. Always use the
manufacturers’ specified spare parts.
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Gas Safe registration N
o
:
Max rate
CO ppm
CO
²
%
CO/CO
²
Min rate
CO ppm
CO
²
%
CO/CO
²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
*A System inhibitor efficacy test is required on every annual service in accordance with the manufacturers’
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
*A System inhibitor efficacy test is required on every annual service in accordance with the manufacturers’
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
*A System inhibitor efficacy test is required on every annual service in accordance with the manufacturers’
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
*A System inhibitor efficacy test is required on every annual service in accordance with the manufacturers’
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
*A System inhibitor efficacy test is required on every annual service in accordance with the manufacturers’
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
*A System inhibitor efficacy test is required on every annual service in accordance with the manufacturers’
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Gas Safe registration N
o
:
Max rate
CO ppm
CO
²
%
CO/CO
²
Min rate
CO ppm
CO
²
%
CO/CO
²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Gas Safe registration N
o
:
Max rate
CO ppm
CO
²
%
CO/CO
²
Min rate
CO ppm
CO
²
%
CO/CO
²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Gas Safe registration N
o
:
Max rate
CO ppm
CO
²
%
CO/CO
²
Min rate
CO ppm
CO
²
%
CO/CO
²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Gas Safe registration N
o
:
Max rate
CO ppm
CO
²
%
CO/CO
²
Min rate
CO ppm
CO
²
%
CO/CO
²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Gas Safe registration N
o
:
Max rate
CO ppm
CO
²
%
CO/CO
²
Min rate
CO ppm
CO
²
%
CO/CO
²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
Содержание BLADE TWIN PLUS TPWH60
Страница 2: ......
Страница 6: ...4 Blade 60 80 Twin Plus Water Heater Manual July 2020 3 0 BLADE WATER HEATER SCHEMATIC LAYOUT ...
Страница 7: ...Blade 60 80 Twin Plus Water Heater Manual July 2020 5 3 1 SCHEMATIC LEGEND ...
Страница 17: ...Blade 60 80 Twin Plus Water Heater Manual July 2020 15 9 0 MAINTENANCE AND SERVICING CLEARANCES ...
Страница 18: ...16 Blade 60 80 Twin Plus Water Heater Manual July 2020 10 0 INSTALLATION SCHEMATIC LAYOUT ...
Страница 21: ...Blade 60 80 Twin Plus Water Heater Manual July 2020 19 13 0 WIRING DIAGRAM ...
Страница 29: ...Blade 60 80 Twin Plus Water Heater Manual July 2020 27 Notes ...
Страница 30: ...APPENDIX A ALPHA BOILER MANUAL ...
Страница 89: ...59 Alpha E Tec S 20 30 and 35 Page intentionally Blank ...
Страница 99: ...Blade 60 80 Twin Plus Water Heater Manual July 2020 29 APPENDIX B DAB PUMP MANUAL ...
Страница 113: ...ENGLISH 41 It is dangerous to touch the circulator DANGER OF SCALDING ...
Страница 123: ...ENGLISH 51 18 PERFORMANCE CURVES EVOSTA2 40 70 XXX ...
Страница 124: ...ENGLISH 52 EVOSTA2 80 XXX ...
Страница 125: ...ENGLISH 53 EVOSTA3 40 XXX ...
Страница 126: ...ENGLISH 54 EVOSTA3 60 XXX ...
Страница 127: ...ENGLISH 55 EVOSTA3 80 XXX ...