background image

RackSwitch G8124 Installation Guide

4

  

„

  Contents

BPP-00018-01, December 2009

Initializing the RackSwitch G8124  

„

  

32

Default Configuration  

„

  

33

Configuring an IP Interface  

„

  

34

Using the Boot Management Menu  

„

  

35

Installing an SFP or SFP+ Transceiver  

„

  

36

SFP+ Optical Transceiver  

„

  

36

SFP Copper Transceiver  

„

  

37

Troubleshooting  

„

  

38

System LEDs Do Not Light  

„

  

38

Port link LED Does Not Light  

„

  

38

Temperature Sensor Warning  

„

  

38

Switch Does Not Initialize (Boot)  

„

  

39

Appendix A: Safety and Compliance Statements  

„

  41

Safety Messages  

„

  

41

Compliance Statements  

„

  

46

Содержание BLADEOS RackSwitch G8124

Страница 1: ...2350 Mission College Blvd Suite 600 Santa Clara CA 95054 www bladenetwork net RackSwitch G8124 Installation Guide Part Number BPP 00018 01 December 2009...

Страница 2: ...oftware documentation as those terms are used in FAR 12 211 12 212 Oct 1995 Government End Users are authorized to use this documentation only in accordance with those rights and restrictions set fort...

Страница 3: ...Switch Ports 12 LEDs 15 Technical Specifications 17 Physical Characteristics 17 Environmental Specifications 17 Power Specifications 18 Ordering Information 19 Chapter 2 Installing the RackSwitch G81...

Страница 4: ...34 Using the Boot Management Menu 35 Installing an SFP or SFP Transceiver 36 SFP Optical Transceiver 36 SFP Copper Transceiver 37 Troubleshooting 38 System LEDs Do Not Light 38 Port link LED Does Not...

Страница 5: ...d for network installers and system administrators engaged in configuring and maintaining a network It assumes that you are familiar with your RackSwitch G8124 your Web browser Ethernet concepts IP ad...

Страница 6: ...ative If you are unable to locate this information please contact your reseller Before you call prepare the following information Serial number of the switch unit Software release version number Brief...

Страница 7: ...s 10Gb optical transceivers or Direct Attach Cables DAC This 1U switch is rack mountable in either the horizontal or vertical direction depending on your application You can manage the switch through...

Страница 8: ...interface Wire speed filtering with Access Control Lists ACLs Layer 2 1024 VLANs 802 1Q including Private VLANs Multi link trunking compatible with Cisco EtherChannel LACP IEEE 802 3ad Spanning Tree 8...

Страница 9: ...mounting brackets and screws Switch Unit The RackSwitch G8124 switch unit is a 1U rack mountable 10 Gigabit Ethernet switch You can mount the G8124 in either the horizontal or vertical direction The R...

Страница 10: ...Figure 2 RackSwitch G8124 Rear Panel AC Figure 3 RackSwitch G8124 Rear Panel DC 9 10 11 12 5 6 7 8 Stacking SP L A MB MS 17 18 19 20 13 14 15 16 21 22 23 24 Mgmt B A BLADE Rackswitch G8124 1 2 3 4 10...

Страница 11: ...fans AC Power Supply The G8124 has two redundant 275W AC power supplies Each internal power supply has an individual IEC 320 power connector on the rear panel The power cord attaches to a universal gr...

Страница 12: ...iguration the dual power supplies have a load sharing capability that allows each supply to operate at approximately 50 percent of full load Using redundant power can minimize the power disruption dur...

Страница 13: ...ents Table 1 Recommended SFP Transceiver Part number Description BN CKM SP SR SFP 10GBase SR Short Range Optical Fiber Transceiver BN CKM SP LR SFP 10GBase LR Long Range Optical Fiber Transceiver BN C...

Страница 14: ...escribes the pinouts for the mini USB port The following table describes the wiring of the console cable Table 3 Console Port pin assignments Pin number Function Pin 1 No connect Pin 2 RS232_SIN Pin 3...

Страница 15: ...r input status Fans status Stacking master indicator Stacking member indicator Table 5 System LEDs Status Function Power Fan Master Member Total Power Failure Off Off Off Off Service Required Blink Gr...

Страница 16: ...for the data port slots are described in the following table RJ 45 LEDs Status LEDs for the RJ 45 ports are described in the following table Stacking SP L A MB MS Rackswitch G8124 1 2 3 4 BLADE Table...

Страница 17: ...re listed in the following table Table 8 Physical Characteristics Specification G8124F G8124R Dimensions H x W x D 1 73 x 17 3 x 15 0 in 4 4 x 43 9 x 38 1 cm 1 73 x 17 3 x 15 0 in 4 4 x 43 9 x 38 1 cm...

Страница 18: ...f power supplies 2 1 1 redundant AC input frequency universal 50 60 Hz AC input voltage universal 100 240 VAC AC input current 2 75A RMS 100VAC 1 15A RMS 240VAC AC input fuse 5A internal Power supply...

Страница 19: ...BN 8124F DC BDL DC powered G8124R 24 port GbE Switch front to rear airflow Pluggable Optics BN CKM SP SR SFP 10GBase SR Short Range Optical Fiber Transceiver BN CKM SP LR SFP 10GBase LR Long Range Op...

Страница 20: ...RackSwitch G8124 Installation Guide 20 Chapter 1 RackSwitch G8124 Description and Specifications BPP 00018 01 December 2009...

Страница 21: ...s document Standard flat blade screwdriver 2 Phillips screwdriver Electrostatic discharge wrist strap Package Contents The basic RackSwitch G8124 package contains the following items G8124 switch unit...

Страница 22: ...gned to work with single phase power systems that have a grounded neutral conductor To reduce the risk of electric shock always plug the power cord into a grounded power outlet Warning Electrical curr...

Страница 23: ...ti static wrist or ankle strap protects the equipment from ESD voltages on the body ESD voltages on clothing also can cause damage Do not touch connector pins Installing the RackSwitch G8124 in a Stan...

Страница 24: ...8124 1 Use the M4 screws to attach a mounting bracket to each side of the switch Torque the screws to approximately 30 inch pounds 3 5 Nm Figure 5 Attaching the Mounting Brackets Caution Do not stack...

Страница 25: ...hapter 2 Installing the RackSwitch G8124 25 2 Slide the switch into the rack as illustrated Figure 6 Rack mounting the Switch Unit 3 Use M6 screws washers and clip nuts to secure the switch unit to th...

Страница 26: ...ther rack types refer to the following sections Installing the RackSwitch G8124 in a Standard Equipment Rack on page 23 Installing the RackSwitch G8124 in a 4 post Rack on page 29 The mounting kit is...

Страница 27: ...kSwitch G8124 27 Perform the following steps to mount the RackSwitch G8124 into an iDataPlex rack 1 Use the M4 screws to attach front and rear mounting brackets to each side of the switch unit Torque...

Страница 28: ...and clip nuts are used to attach the alignment plate Torque the screws to approximately 30 inch pounds 3 5 Nm Figure 8 Attaching the Alignment Plate 3 M6 screws washers and clip nuts are used to moun...

Страница 29: ...included in the standard 4 post mounting kit The e1350 Type 1410 mounting kit is ordered separately The following table lists the parts included in the mounting kit Table 15 BN 4POST RLS 4 Post Rack M...

Страница 30: ...post rack 1 Use the M4 screws to attach a horizontal rail to each side of the switch Torque the screws to approximately 10 inch pounds 1 1 Nm Figure 10 Attaching the Horizontal Rail 2 M6 screws washer...

Страница 31: ...to the rack with M6 screws washers and clip nuts Torque the screws to approximately 30 inch pounds 3 5 Nm Figure 12 Attaching Rear Mounting Brackets 4 The front mounting brackets and the rear mounting...

Страница 32: ...e to connect the RS 232 serial port on the switch unit s front panel to a terminal or a PC running a terminal emulation program You can access the command line interface to perform initial configurati...

Страница 33: ...Default Configuration The switch software contains default configuration files that are loaded at the factory The default configuration is part of the software it cannot be deleted or changed The def...

Страница 34: ...itch The management station and your switch must be on the same IP subnet The G8124 supports a command line interface CLI that you can use to configure and control the switch using Telnet You can use...

Страница 35: ...ress Shift B The Boot Management menu appears The Boot Management menu allows you to perform the following actions To change the boot image press 1 and follow the screen prompts To change the configur...

Страница 36: ...unlocked position 2 Insert the transceiver into the port until it clicks into place Use minimal pressure when you insert the transceiver into the slot Do not use excessive force when you insert the t...

Страница 37: ...Remove the safety cap and pull the locking lever into the down unlocked position 2 Insert the transceiver into the port until it clicks into place Use minimal pressure when you insert the transceiver...

Страница 38: ...f the port is configured with a specific speed or duplex mode check the other device to verify that it is set to the same configuration If the switch port is set to autonegotiate verify that the other...

Страница 39: ...witch G8124 39 Switch Does Not Initialize Boot Symptom All the switch LEDs stay on and the command prompt does not appear on the console Solution The operating system may have been damaged Use the con...

Страница 40: ...RackSwitch G8124 Installation Guide 40 Chapter 2 Installing the RackSwitch G8124 BPP 00018 01 December 2009...

Страница 41: ...el ctricos que tienen una trayectoria que pone a tierra y conecte siempre el cable el ctrico con un enchufe de energ a correctamente puesto a tierra VORSICHT Zu das Risiko des Elektroschocks verringe...

Страница 42: ...talling uninstalling or moving this product Avertissement Le courant lectrique des c bles d alimentation des c bles t l phonique et des c bles de communication est dangereux Pour viter tout risque de...

Страница 43: ...ms antes de que usted abra las cubiertas del dispositivo a menos que est dado instruc ciones de otra manera en los procedimientos de la instalaci n y de configuraci n Desconecte la fuente de alimentac...

Страница 44: ...he switch powers up immediately Disconnecting the switch from the power source is the only way to power down the G8124 Always provide the power source in a location that is quickly and safely accessib...

Страница 45: ...module propre et emp che l exposition accidentelle au faisceau laser Inspectez et nettoyez toujours les contours du connecteur LC avant tout branchement PRECAUCI N Producto Del Laser De la Clase 1 No...

Страница 46: ...limits for a Class A digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a com...

Страница 47: ...quirements of EU Council Directive 2004 108 EC on the approximation of the laws of the Member States relating to electromagnetic compatibility Blade Network Technologies Inc cannot accept responsibili...

Страница 48: ...C P 04460 M xico D F Input RackSwitch G8124 G8124F AC 100 240 V 1 5 50 60 Hz Chassis power consumption 275W G8124R AC 100 240 V 1 5 50 60 Hz Chassis power consumption 275W La informaci n siguiente se...

Страница 49: ...Business applications only per the Class A requirements of the Republic of Korea Ministry of Information and Communications MIC This device may not be sold for use in a non business application Observ...

Страница 50: ...that the content of the toxic and hazardous substance in at least one homogeneous material of the part exceeds the concentration limit requirement as described in SJ T 11363 2006 Environmental Protec...

Страница 51: ...RackSwitch G8124 Installation Guide BPP 00018 01 December 2009 Appendix A Safety and Compliance Statements 51...

Страница 52: ...RackSwitch G8124 Installation Guide 52 Appendix A Safety and Compliance Statements BPP 00018 01 December 2009 2350 Mission College Blvd Suite 600 Santa Clara CA 95054 www bladenetwork net...

Отзывы: