6. Fixing of lift
-
Using a concrete drill, bore 6 holes of 16mm diameter and 120mm depth in the floor.
-
Use the lift frame as a template.
-
Clean the holes and with the help of a hammer, insert the supplied expansive bolts in the floor.
-
With a torque wrench, tighten the bolts with a torque of 50Nm.
7. First start-up
By an officer empowered. BLACKHAWK® discharge from liability in the event of non-compliance with this directive.
WARNING
Only skilled and authorised personnel should carry out the following operations
WARNING
Follow instructions carefully in order to prevent damage to lift or injury to persons
WARNING
Ensure that the operating area is clear
-
After positioning the lift and connecting the electric, hydraulic and pneumatic supplies, proceed with initial
running operations.
-
Move the main switch to position “1” and press the lifting button to lift the platform to its maximum height.
(See chapter VII OPERATION)
If the motor rotates but lifting operations cannot be performed, check the motor for correct direction of
rotation and if necessary change phases on the power supply line.
-
Press the lifting button again until the platform is completely raised.
-
Press the lowering button to bring the platform down: it will stop about 30cm from the floor.
-
Press the lowering button again to bring it back to its original position.
-
Air will be automatically eliminated during each lifting- lowering cycle.
8. Use suitability
WARNING
Follow the indications carefully in order to avoid damage to people or objects and to the lift.
-
Before using the lift and after fixing it to the floor and checking the safety devices, proceed with the static
and dynamic load tests by an authorized body in compliance with the laws of the country where the lift is
installed.
-
The periodic controls also are to be made by the user, according to periodicity and the modalities defined by the
local regulations.