SPEED AIR-40.
Instruction Manual.
14
1) Drill through 6mm (diameter) the eleva-
tor using the control horn as a guide and
screw the control horn in place.
Drill hole.
6) When you a sure that everything is
aligned correctly, mix up a generous amount
of 30 Minute Epoxy. Apply a thin layer to the
top and bottom of the stabilizer mounting plat-
form sides in the fuselage. Slide the stabilizer
in place and realign. Double check all of your
mea-surements once more before the epoxy
cures. Hold the stabilizer in place with T-pins
or masking tape and remove any excess ep-
oxy using a paper towel and rubbing alcohol.
Epoxy glue.
7) After the epoxy has fully cured, remove
the masking tape or T-pins used to hold the
stabilizer in place. Carefully inspect the glue
joints. Use more epoxy to fill in any gaps that
may exist that were not filled previously and
clean up the excess using a paper towel and
rubbing alcohol.
C/A glue.
Elevator control horn install as same as the
way of aileron control horn. Please see pictures
below.
3mm x 40mm.
M3 lock nut
.
Nilon
control clasp.
Control horn of elevator.
ELEVATOR CONTROL HORN INSTALLA-
TION.
Mark point.
bend
When cutting through the covering to re-
move it, cut with only enough pressure to
only cut through the covering itself. Cut-
ting into the balsa structure may weaken
it.
5. Using a modeling knife, carefully re-
move the covering that overlaps the stabilizer
mounting platform sides in the fuselage. Re-
move the covering from both the top and the
bottom of the platform sides.