Instruction Manual.
11
Remove covering.
5) When you a sure that everything is
aligned correctly, mix up a generous amount
of 30 Minute Epoxy. Apply a thin layer to the
top and bottom of the stabilizer mounting plat-
form sides in the fuselage. Slide the stabilizer
in place and realign. Double check all of your
mea-surements once more before the epoxy
cures. Hold the stabilizer in place with T-pins
or masking tape and remove any excess ep-
oxy using a paper towel and rubbing alcohol.
When cutting through the covering to re-
move it, cut with only enough pressure to
only cut through the covering itself. Cut-
ting into the balsa structure may weaken
it.
Top side.
Bottom side.
ELEVATOR CONTROL HORN
PUSHROD INSTALLATION.
1) Locate the two nylon control horns, two
nylon control horn backplates and four M2 x
12mm machine screws.
2) Position the elevator horn on the bottom
side of elevator. The clevis attachment holes
should be positioned over the hinge line.
Control Horn.
Mounting Screws.
Mounting Plate.
C/A glue.
6) After the epoxy has fully cured, remove
the masking tape or T-pins used to hold the
stabilizer in place. Carefully inspect the glue
joints. Use more epoxy to fill in any gaps that
may exist that were not filled previously and
clean up the excess using a paper towel and
rubbing alcohol.
3) Using a 1.5mm drill bit and the control
horns as a guide, drill the mounting holes
through the elevator halves.
Epoxy glue.
2 x 16mm.