background image

SUKHOI 31.

           

                                                         

INSTRUCTION MANUAL

9

 

8. Feed three lines through the fuel tank

compartment and through the pre-drilled hole
in the firewall. Pull the lines out from behind
the engine, while guiding the fuel tank into
place. Push the fuel tank as far forward as
possible, the front of the tank should just about
touch the back of the firewall.

 

6. When satisfied with the alignment of the

stopper assembly tighten the 3mm x 20mm
machine screw until the rubber stopper ex-
pands and seals the tank opening. Do not over
tighten the assembly as this could cause the
tank to split.

 

7. Using a modeling knife, cut 3 lengths of

fuel line 150mm long. Connect 2 lines to the 2
vent tubes and 1 line to the fuel pickup tube in
the stopper.

   When the stopper assembly is installed
in the tank, the top of the vent tube should
rest just below the top surface of the tank.
It should not touch the top of the tank.

 

1. The stopper has been pre-assembled at

 the factory.

 

2. Using a modeling knife, cut one length of

silicon fuel line (the length of silicon fuel line is
calculated by how the weighted clunk should
rest about 8mm away from the rear of the tank
and move freely inside the tank). Connect one
end of the line to the weighted clunk and the
other end to the nylon pick up tube in the stop-
per.

 

3. Carefully bend the second nylon tube up

at a 45 degree angle (using a cigarette lighter).
This tube will be the vent tube to the muffler.

 

4. Carefully bend the third nylon tube down

at a 45 degree angle (using a cigarette lighter).
This  tube will be vent tube to the fueling valve.

 

5. Test fit the stopper assembly into the

tank. It may be necessary to remove some of
the flashing  around the  tank  opening  using
a modeling knife.  If flashing  is  present,  make
sure none of it falls into the tank.

      Blow through one of the lines to ensure
the fuel lines have not become kinked inside
the fuel tank compartment. Air should flow
through easily.

 

9. To secure the fuel tank in place, apply a

bead of silicon sealer to the forward area of
the tank, where it exits the fuselage behind the
engine mounting box and to the rear of the tank
at the forward bulkhead.

Содержание SUKHOI 31 BH11

Страница 1: ...CIFICATION Wingspan 1 400 mm 55 in Length 1 250 mm 49 in Weight 2 6 kg 5 72 Lbs Radio 04 channels Servo 05 servos Engine 46 2 Stroke 52 70 4 Stroke Instruction Manual book Made in Vietnam ITEM CODE BH...

Страница 2: ...read lock Paper towels Some more parts HARDWAREPACK COWLING Landing gear To avoid scratching your new airplane do not unwrap the pieces until they are needed for assembly Cover your workbench with an...

Страница 3: ...propeller Do not start the engine if people are near Do not stand in line with the side of the propel ler Make engine adjustments from behind the propeller only Do not reach around the spin ning prop...

Страница 4: ...masking tape tape the servo lead to the end of the thread carefully pull the thread out When you have pulled the servo lead out re move the masking tape and the servo lead from the thread Electric wir...

Страница 5: ...diameter the aileron using the control horn as a guide and screw the control horn in place 1 Using a ruler pen to draw a straight line as below picture 2 Locate nylon control horn nylon con trol horn...

Страница 6: ...e 90 degree bend down through the hole in the servo arm Install one nylon snap keeper over the wire to secure it to the arm Install the servo arm retaining screw and remove the masking tape from the a...

Страница 7: ...NUAL 7 3 Test fit the dihedral brace into each wing half The brace should slide in easily Remove covering Masking tape Apply masking tape Epoxy glue Aluminium brace Masking tape INSTALLING THE ENGINE...

Страница 8: ...SUKHOI 31 Instruction Manual 8 INSTALLING THE STOPPER ASSEMBLY cut INSTALLING THE ENGINE MOUNT 3x20mm 4x25mm FUEL TANK...

Страница 9: ...g knife cut one length of silicon fuel line the length of silicon fuel line is calculated by how the weighted clunk should rest about 8mm away from the rear of the tank and move freely inside the tank...

Страница 10: ...y This Z bend should be inserted into the throttle arm of the engine when the engine is fitted onto the engine mount Fit the engine to the engine mount using the screws provided Do not secure the tank...

Страница 11: ...SUKHOI 31 INSTRUCTION MANUAL 11 Secure Pushrod wire Trim and cut COWLING 1 Slide the fiberglass cowl over the en gine and line up the back edge of the cowl with the marks you made on the fuselage...

Страница 12: ...of the cowl should be positioned so the crankshaft is in nearly the middle of the cowl opening Hold the cowl firmly in place using pieces of masking tape 4 Install the muffler and muffler extension on...

Страница 13: ...ering from the fuselage for the stabilizer and remove it HORIZONTAL STABILIZER ELEVATOR INSTALLATION Elevator servo Remove covering 2 Draw a center line onto the horizontal stabilizer Then slide the h...

Страница 14: ...asking tape or T pins used to hold the stabilizer in place and carefully inspect the glue joints Use more epoxy to fill in any gaps that were not filled previously and clean up the excess using a pape...

Страница 15: ...Elevator control horn install as same as the way of aileron control horn Please see pic tures below Control horn of elevator 3mm x 40mm M3 lock nut Nilon control clasp Pen Bottom side ELEVATOR CONTRO...

Страница 16: ...31 Instruction Manual 16 C A glue C A glue C A glue Top side Bottom side ELEVATOR PUSHROD INSTALLATION Elevator pushrod install as same as the way of aileron pushrod Elevator control horn Elevator pu...

Страница 17: ...SUKHOI 31 INSTRUCTION MANUAL 17 C A glue Cut Bend Elevator servo Bend and cut after VERTICAL INSTALLATION Rudder servo Snap keeper...

Страница 18: ...ing knife remove the covering from the top of the fuselage and the covering from over the precut hinge slot cut into the lower rear portion of the fuselage This slot accepts the lower vertical Control...

Страница 19: ...de gree to the horizontal stabilizer Pen 6 When you are sure that everything is a aligned correctly mix up a generous amount of 30 minute epoxy Apply a thin layer to the slot in the mounting platform...

Страница 20: ...stall as same as the way of aileron control horn Please see pic tures below Drill 6mm a hole of the mounting rudder control horn on to the rudder with 6mm diam eter Control horn of Rudder Pen Mark a h...

Страница 21: ...xcess mate rial from the arm After installing the adjustable metal con nector apply a small drop of thin C A to the bottom nut This will prevent the con nector from loosening during flight Servo arm C...

Страница 22: ...foam to protect them from vi bration Use a rubber band or masking tape to hold the foam in place 3 Position the battery pack and receiver behind the fuel tank Use two tie wraps to hold the battery and...

Страница 23: ...l a hole Trim 3 Using the hardware provided mount the main landing gear to the fuselage 2 A drop of C A glue on the wheel collar screws will help keep them from coming lose during operation Repeat the...

Страница 24: ...ING THE TAIL WHEEL BRACKET 2 Using a pen mark the locations of the two mounting screws Remove the tail wheel bracket and drill 1mm pilot holes at the loca tions marked 3 Secure the tail wheel bracket...

Страница 25: ...cal that your airplane be bal anced correctly Improper balance will cause your plane to lose control and crash THE CENTER OF GRAVITY IS LOCATED 100 115mm BACK FROM THE LEADING EDGE OF THE WING 2 Mount...

Страница 26: ...heavy and you must add weigh to the nose If the nose drops it is nose heavy and you must add weight to the tail to balance If possible first attempt to balance the model by changing the position of t...

Страница 27: ...SUKHOI 31 INSTRUCTION MANUAL 27...

Отзывы: