background image

7

1.877.877.2269

BLACKBOX.COM

NEED HELP?

LEAVE THE TECH TO US

LIVE 24/7

TECHNICAL

SUPPORT

1.877.877.2269

CHAPTER 2: OVERVIEW

2.5 HARDWARE DESCRIPTION 

 

 

2.5.1 FRONT PANEL   

 
Figure 2-1 shows the front panel of the switch. Table 2-1 describes its components.

FIGURE 2-1. FRONT PANEL OF THE SWITCH

TABLE 2-1. FRONT PANEL COMPONENTS

  NUMBER IN  

  FIGURE 2-1

COMPONENT

DESCRIPTION

  1

 (1) Micro USB-B port

Connects to console

  2

 (1) RJ-45 port

Links to serial console

  3

 (32) 10/25/40/50/100 ports

SFP+ modules install here

  4

 (2) 1000M/10G SFP+ ports

SFP+ modules install here

  5

 Stack ID

Unique number between 1-6 used when stacking switches

  6

 USB Type A connector

Storage

  7  

 (1) RJ-45 port

10/100/1000BASE-T Ethernet management port

  8

 Luggage tag

Contains MAC Address, Service tag or express service code and QR code to documentation.

TABLE 2-2. COMPATIBLE SFPS

PRODUCT CODE

DESCRIPTION

 LSP421

SFP+ - 10-Gb, Extended Diagnostics, 850-nm Multimode Fiber, 300-m, LC

 LSP422

SFP+, 10GBASE-R, 1310-nm single-mode, 10 km

 Contact Black Box

100 GbE QSFP modules

Содержание EMS100G-32

Страница 1: ...24 7 TECHNICAL SUPPORT AT 1 877 877 2269 OR VISIT BLACKBOX COM 32 PORT 100G IP NETWORK SWITCH HARDWARE INSTALLATION GUIDE EMS100G 32...

Страница 2: ...3 3 Rackmounting 12 3 4 Switch Ground 12 3 5 Fans and Airflow 13 3 6 Power 13 3 7 Storing Components 13 4 NEBS COMPLIANCE 14 4 1 Important Information 14 4 2 NEBS Compliant Ground Installation 14 5 I...

Страница 3: ...ample of ONiE 35 8 4 3 ONiE Service Discovery 35 9 TROUBLESHOOTING 37 9 1 Contacting Technical Support 37 9 2 Shipping and Packaging 37 APPENDIX A REGULATORY INFORMATION 38 A 1 USA Federal Communicati...

Страница 4: ...handling this equipment WARNING Only trained and qualified personnel can install this equipment Read this guide before you install and power up this equipment This equipment contains two power cords...

Страница 5: ...tching Capacity 6 4 Tbps Forwarding capacity Up to 4400 Mpps Full Duplex Packet buffer memory 16MB CPU memory 8GB MAC addresses 136 K ARP entries 128K IPv4 Unicast routes 136 K IPv6 Unicast routes 68K...

Страница 6: ...dditional file storage One 10 100 1000BaseT Ethernet management port Rangeley central processing unit CPU system with 8GB DDR III RAM Temperature monitoring Software readable thermal monitor Real time...

Страница 7: ...2 1 RJ 45 port Links to serial console 3 32 10 25 40 50 100 ports SFP modules install here 4 2 1000M 10G SFP ports SFP modules install here 5 Stack ID Unique number between 1 6 used when stacking swi...

Страница 8: ...2 OVERVIEW 2 5 2 BACK PANEL Figure 2 2 shows the back panel of the switch Table 2 3 describes its components FIGURE 2 2 BACK PANEL OF THE SWITCH TABLE 2 3 BACK PANEL COMPONENTS NUMBER IN FIGURE 2 2 C...

Страница 9: ...TABLE 2 4 LEDS ON THE SWITCH NUMBER IN FIGURE 2 3 NAME OF LED DESCRIPTION 1 Master LED Off Switch is in Stacking Slave mode Solid green System is in Stacking Master or Standalone mode 2 System LED Off...

Страница 10: ...n Normal operation Solid amber Post in process Blinking amber Non critical system error PSU fan failure or power supply failure TABLE 2 5 QSFP28 PORT LEDS NUMBER IN FIGURE 2 3 NAME OF LED DESCRIPTION...

Страница 11: ...LED Off No Link Solid green Port link is 2x50 GbE 4 Activity LED Off No link Flashing amber approx 30 ms port link is 2x50 GbE TABLE 2 8 SFP PORT LEDS NUMBER IN FIGURE 2 3 NAME OF LED DESCRIPTION 4 Li...

Страница 12: ...to 95 F 10 to 35 F Operating humidity is from 5 to 85 percent noncondensing Storage humidity is from 5 to 95 percent noncondensing In a dry clean well ventilated and temperature controlled room away f...

Страница 13: ...low the requirements of the National Electrical Code ANSI NFPA 70 where applicable The switch is powered up as soon as the power cord is connected between the switch and the power source CAUTION Alway...

Страница 14: ...ed access area where only trained personnel are allowed access Install and connect your switch to the common bonding network CBN You can also install and connect your switch to the central office Conn...

Страница 15: ...ws from the lower left side of your chassis NOTE Keep these screws 2 Remove the bracket assembly from the shipping bag 3 Clean the bracket and lug surfaces thoroughly and apply an anti oxidant solutio...

Страница 16: ...US LIVE 24 7 TECHNICAL SUPPORT 1 877 877 2269 CHAPTER 4 NEBS COMPLIANCE FIGURE 4 3 GND LUG ASSEMBLY ATTACHED 5 Install your chassis into your rack using the installation instructions in Chapter 5 6 At...

Страница 17: ...nsed reference Read the safety instructions in your Safety Environmental and Regulatory information booklet before you begin NOTE The illustrations in this document are not intended to represent a spe...

Страница 18: ...two post center mount or four post threaded 1 With the rail flange ears facing outward place one rail between the left and right vertical posts Align and seat the rear flange rail pegs in the rear ver...

Страница 19: ...se a Torx screwdriver to remove the two screws from each front flange ear on the switch side of the rail and remove each casting Retain the castings for future rack requirements It is not necessary to...

Страница 20: ...quake Z4 compliant if you use this installation method 1 Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user supplied screws ite...

Страница 21: ...s latch castings described in Step 1 1 For this configuration remove the flange ear castings from each end of the rail assemblies To remove the two screws from each flange ear and remove each casting...

Страница 22: ...r as the four post configurations 1U FRONT RACK INSTALLATION Configure the rails that are attached to the switch 1 Attach the inner chassis members switch rails to the EMS100G 32 switch Item 3 shows t...

Страница 23: ...xidant compound before crimping Also bring any unplated mating surfaces to a shiny finish and coat with an anti oxidant before mating Plated mating surfaces must be clean and free from contamination N...

Страница 24: ...When working with optical fibers follow all warning labels and always wear eye protection Never look directly into the end of a terminated or unterminated fiber or connector as it may cause eye damage...

Страница 25: ...n the front panel ports and the port pipes is shown FIGURE 5 7 PORT PIPES 5 8 POWERING UP THE SWITCH Supply power to the switch after it is mounted in a rack or cabinet Black Box recommends reinspecti...

Страница 26: ...ponents are mishandled Always wear an ESD preventive wrist or heel ground strap when handling the EMS100G 32 and its components 6 1 COMPONENTS The following power supply is available for the EMS100G 3...

Страница 27: ...2 Remove the PSU from the electro static bag 3 Insert the PSU into the switch PSU slot Insert the PSU exposed PCB edge connector first The PSU slot is keyed so that the PSU can only be fully inserted...

Страница 28: ...he PSU or the switch chassis NOTE If a PSU fails you must replace the entire unit There are no field serviceable components in the PSU To request a hardware replacement contact Black Box Technical Sup...

Страница 29: ...me required between fan replacements Check the environmental factors regularly An increase in temperature and or particulate matter in the air might affect performance for example new equipment instal...

Страница 30: ...the cooling fans An increase in overall fan speed may indicate a clogged filter You must replace the fan air filters with new filters you cannot clean and reuse the old fan air filters Replacement fil...

Страница 31: ...THE TECH TO US LIVE 24 7 TECHNICAL SUPPORT 1 877 877 2269 CHAPTER 7 FANS 7 5 AFTER INSTALLING THE SWITCH After you have securely installed and powered on the switch to configure your switch see your...

Страница 32: ...9 male to male adapter 1 Install the provided RJ 45 connector side of the provided cable into the switch console port 2 Install the DB9 female side of the provided copper cable into your PC s serial p...

Страница 33: ...switch 5 Install the necessary USB device drivers To download the drivers contact Black Box Technical Support at 877 877 2269 or info blackbox com 6 Open your terminal software emulation program to ac...

Страница 34: ...iled No such device or address 4 Add a device to the file systems table fstab and mount the file systems recommended ONIE vi etc fstab FSTAB entry for the ONIE BOOT partition mounted on boot LABEL ONI...

Страница 35: ...loading and updating ONIE from a URL ONIE Embed ONIE For downloading and updating ONIE from a URL and erases any installed O ONIE Diag ONIE Run Diagnostic package for EMS100G 32 Run Black Box Networki...

Страница 36: ...255 255 0 To display the IP address use the ifconfig eth0 command as shown ONIE ifconfig eth0 eth0 Link encap Ethernet HWaddr 90 B1 1C F4 9C 76 inet addr 10 11 53 33 Bcast 10 255 255 255 Mask 255 0 0...

Страница 37: ...e will be able to provide more efficient and accurate assistance if you have a complete description including the nature and duration of the problem when the problem occurs the components involved in...

Страница 38: ...ation of this equipment in a residential area is likely to cause harmful interference in which case users will be required to take whatever measures necessary to correct the interference at their own...

Страница 39: ...tes que impidan el flujo de aire por los orificios de ventilaci n 10 El equipo el ctrico deber ser situado fuera del alcance de fuentes de calor como radiadores registros de calor estufas u otros apar...

Страница 40: ...the limits for Class A Information Technology Equipment according to CISPR 22 European Standard EN 55022 The limits for Class A equipment were derived for commercial and industrial environments to pr...

Страница 41: ...1st Edition EN 60825 1 Safety of Laser Products Part 1 Equipment Classification Requirements and User s Guide EN 60825 2 Safety of Laser Products Part 2 Safety of Optical Fibre Communication Systems...

Страница 42: ...system according to applicable local and national regulations Black Box encourages owners of information technology IT equipment to responsibly recycle their equipment when it is no longer needed Wast...

Страница 43: ...e consequential or cost of cover damages resulting from any errors in the product information or specifications set forth in this document and Black Box Corporation may revise this document at any tim...

Страница 44: ...NEED HELP LEAVE THE TECH TO US LIVE 24 7 TECHNICAL SUPPORT 1 877 877 2269 COPYRIGHT 2018 BLACK BOX CORPORATION ALL RIGHTS RESERVED EMS100G 32_INSTALL_REV1 PDF...

Отзывы: