20
1.877.877.2269
BLACKBOX.COM
NEED HELP?
LEAVE THE TECH TO US
LIVE 24/7
TECHNICAL
SUPPORT
1.877.877.2269
CHAPTER 5: INSTALLING THE SWITCH
TWO-POST CENTER MOUNT INSTALLATION
CAUTION: Your system is not NEBS Earthquake Z4-compliant if you use this installation method.
1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied
screws, item 1.
1
2
FIGURE 5-3. TWO-POST CENTER-MOUNT CONFIGURATION
2. Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, to item 2.
3. Repeat this procedure for the second rail.