CHAPTER 5: INSTALLING THE SWITCH
TWO-POST FLUSH MOUNT INSTALLATION
CAUTION: Your system is not NEBS Earthquake Z4-compliant if you use this installation method.
1. For this configuration, remove the castings from the front side of each rail assembly, item 1.
Use a Torx screwdriver to remove the two screws from each front flange ear on the switch side of the rail and remove each casting.
Retain the castings for future rack requirements. It is not necessary to remove the rear flange castings.
2
3
1
FIGURE 5-2. TWO-POST FLUSH-MOUNT CONFIGURATION
2. Attach one rail to the front post flange with two user-supplied screws, item 2.
3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-
supplied screws, item 3.
4. Repeat this procedure for the second rail.