The electrical connection must be made by an expert.
I.E.E. regulations must be complied with.
Please observe NIN (CENELEC) regulations.
In the case of higher water temperatures (over 80 °C), use an
appropriate heat-resistant connecting line.
Be sure to provide protection against dripping water and a mains
lead cleat at the cable inlet to the connection box (gland)!
Preliminary fuse:
(rated current
×
1.5)
max. 10 A, delay-action
Wire cross section:
2,5 mm
2
.
The electrical connection must be made in accordance with the
data plate. To simplify later replacement, the electrical connection
should be looped. It is important to check that the electrical dates
given on the compalison of types agrees with the local current
supply.
Note:
Particular attention must be given to the protective ground
terminal. The protective ground must be longer than the pole
conductor (danger of tearing off).
5.1 Supply voltage:
1
×
230 V +6%/–10%, 50 Hz, PE
5.2 Connecting terminals
5. Electrical connection
english
40
Before carrying out any operations in the terminal box,
the power supply to the pump must be switched off.
Mains connection 1
×
230 V
Earth (PE)
L
Live
N
Neutral
If the connection is made incorrectly and the voltage
is wrong the motor will be damaged!
M
MX/SX
The motor is short-circuit proof
and requires no overload protection!
Warning
Содержание M 14
Страница 24: ...DIN 4844 W8 DIN 4844 W9 1 1 1 1 2 1 3 1 4 76...
Страница 25: ...1 5 1 6 NIN CENELEC 1 7 1 8 1 9 77 2...
Страница 28: ...80 5 1 230 V PE L N MX SX EVU NIN CENELEC 80 C 1 5 10 A 2 5 2 5 1 1 230 V 6 10 50 Hz PE 5 2...
Страница 30: ...82 6 6 1 6 2 0 5 5 8 6 3 6 4 2...
Страница 31: ...83 8 6 4 6 2 6 2 7...