background image

 

 
 

11 

www.bioneer.com 

BQ-042-101-13 

Revision :0 (2018-07-05)

 

 

AccuLoader

 

VI.

 

Unpacking and Installation 

 
 

1.

 

Checking the installation environment 

 

1)

 

Check the environmental requirements for installation from 

“IV. 

Warnings and Cautions for Safety

 

 

2.

 

Unpacking and installing 

 

Pay attention to the details below for unpacking and installation for your safety. 

 

Check the location where you can hold the instrument comfortably. 

 

1)

 

Unpacking 
(Materials needed: box knife, scissors, or utility knife and gloves, etc.) 

a)

 

Cut off the packing straps using scissors, etc. 

b)

 

Take out the box of accessories from the upper box of the package. 

c)

 

Separate the protection cover from the package and take out the instrument. 
 

2)

 

Checking the accessories and the consumables 
Check the composition part of 

V. Product Description

If any component is not included or damaged, contact your local distributor or BIONEER. 
 

3)

 

Installing the instrument 

a)

 

Lift the instrument from the package and move it to the desired location. 

b)

 

Remove the packaging and check if there is any damage to the instrument. 

 

 

If  the  instrument  is  damaged,  record  the  condition  and  area  of  the  damage  and  contact  your  local 
distributor. 

 

3.

 

Checking the operation 

 

 

1)

 

Connect  the  adapter  to  the  adapter  jack  at  the  back  of  the 
instrument and electrical outlet. 

Содержание AccuLoader A-5251

Страница 1: ...AccuLoader Multi Well Sample Loader A 5251 35 15 MT Promedt Consulting GmbH Altenhofstr 80 D 66386 St Ingbert Germany Tel 49 6894 58 10 20...

Страница 2: ...ader User Guide Read all contents in this manual before using the instrument BIONEER Corporation 8 11 Munpyeongseo ro Daedeok gu Daejeon 34302 Republic of Korea Tel 82 42 930 8777 Fax 82 42 930 8688 E...

Страница 3: ...ct apart from its intended purpose as described in the appropriate and applicable User Guide BIONEER assures liability under the condition that the user discloses all information related to the proble...

Страница 4: ...quirements UL 61010 1 2012 3rd Ed 5 11 12 CSA C22 2 No 61010 1 12 MANUFACTURER BIONEER CORPORATION 8 11 Munpyeongseo ro Daedeok gu Daejeon 34302 Republic of Korea EUROPEAN REPRESENTATIVE MT Promedt Co...

Страница 5: ...harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interferen...

Страница 6: ...t 11 2 Unpackingand installing 11 3 Checking the operation 11 VII Operation 14 1 Program description 14 2 Running the program 14 VIII Maintenance 21 1 General maintenance 21 2 Cautions after operation...

Страница 7: ...Figure 4 LED status indicator 9 Figure 5 Barcode reading angles 10 Figure 6 Home screen 14 Figure 7 Setting screen 15 Figure 8 Setting screen description 16 Figure 9 Start button 17 Figure 10 NTC dis...

Страница 8: ...ode information Exchangeability of spill pad for the opening of the contamination shield cover Heat transfer capability of cartridge mounting block for sample incubation II Applications The operation...

Страница 9: ...periment Do not run any other application during operation It may cause malfunction or affect the results of the experiment Keep a safe distance from the moving parts of the instrument It may cause in...

Страница 10: ...eaters 6 Install the instrument away from water or humidity If not it can cause an electrical shock fire or failure of the instrument 7 Do not install the instrument where flammable or corrosive gas i...

Страница 11: ...he program during operation Samples will not be dispensed at the correct location and it may affect the results of the experiment 4 Warnings and cautions for instrument 1 Use the instrument only accor...

Страница 12: ...ponents Cat No Q ty AccuLoader A 5251 1 96 well cartridge block 1 Cartridge block pin 4 User Guide 1 Adapter 1 Power cable 1 Spill pad for opening for sample dispensation consumable 1 48 well sample t...

Страница 13: ...ision 0 2018 07 05 AccuLoader 2 Structure Figure 1 Top view No Name 1 Main Body of AccuLoader 2 Contamination shield cover 3 Contamination shield cover handle 4 Opening for sample dispensation 5 Conta...

Страница 14: ...8 www bioneer com BQ 042 101 13 Revision 0 2018 07 05 AccuLoader Figure 2 Left side view Figure 3 Right side view No Name 6 Push power button 7 USB port 8 Barcode reader 9 Power adapter jack...

Страница 15: ...D indicator located on the left side of the instrument is as following Figure 4 LED status indicator RGB LED Colors R e d Error G r e e n Ready Yellow Initializing C y a n Running Purple Completed W h...

Страница 16: ...3 237 10 mil Code 39 2 2 55 15 0 381 12 8 326 13 mil 100 UPC 2 0 52 18 0 457 16 0 405 15 mil Code 39 1 77 45 21 5 547 19 73 502 20 mil Code 39 1 7 43 26 8 680 25 1 637 40 mil Code 39 3 4 85 35 1 891...

Страница 17: ...b Take out the box of accessories from the upper box of the package c Separate the protection cover from the package and take out the instrument 2 Checking the accessories and the consumables Check t...

Страница 18: ...cuLoader 2 Turn on the instrument by pressing the power button on the left side and check if initialization is performed 3 Turn on the operation application and start the application 4 Check the Bluet...

Страница 19: ...and tap the Start button 6 Move a sample tube with a barcode to the scanning area of the instrument The barcodes must be scanned at the exact location for its accuracy 7 Prepare for experiment if the...

Страница 20: ...cuLoader program is an application operating program The intention of AccuLoader operation is to assist operators in dispensation of samples with accuracy especially for pooled samples 2 Running the p...

Страница 21: ...r 2 Home screen will appear after the first splash screen disappears It will display the previously set conditions Figure 7 Setting screen 3 Tap the SETUP button on the left side of the screen The ID...

Страница 22: ...re 8 Setting screen description Item Description Sample Count Total number of samples including the controls Pooling Count Number of samples per well excluding the controls Sample Volume Has initial v...

Страница 23: ...tart button 7 Run screen will appear An animation will display the location for the NTC no template control well Scan the NTC tube with the barcode scanner and the plate will move from the starting po...

Страница 24: ...will display the location for the PC positive control well Scan the PC tube with the barcode scanner and the plate will move so that the opening is on the PC well Open the PC tube cap and dispense the...

Страница 25: ...arcode scanning and sample dispensation steps as many times as the assigned pool size for the sample tubes Figure 12 Sample dispensation 10 All completed status will be displayed When all dispensation...

Страница 26: ...20 www bioneer com BQ 042 101 13 Revision 0 2018 07 05 AccuLoader Figure 13 Completion of operation 11 In case of dispensing into a new cartridge repeat from Step 5...

Страница 27: ...ment gets contaminated for disassembly and cleaning of the instrument You may be charged for service 3 Cleaning the instrument 1 Use distilled water DW 70 ethanol nucleic acid degradation solution etc...

Страница 28: ...e instrument 1 Store the instrument following the warnings and precautions provided in the manual when not in use 2 Store the instrument following all storage conditions specified above 8 Disposal of...

Страница 29: ...the adapter connector and the adapter jack at the back of the instrument 4 Check if the power button is at the off position 5 Request for service The instrument does not perform initialization 1 Check...

Страница 30: ...r Adapter input 100 240 V 50 60Hz 1 5A Max Output 24V DC 2 5A Instrument Input 24V DC 2 5A Operation specifications Temperature 15 35 C 59 0 95 0 Humidity 20 80 no condensation System Operation contro...

Страница 31: ...n 4 Pack the instrument with the original packaging Do not send the power cord and other accessories 5 Send the instrument to your local distributor or hand over the process to the salesperson in char...

Страница 32: ...ervice and customer support regulations of BIONEER and other matters will be reviewed and implemented for user convenience 3 Details on instrument exchange Instrument exchange is proceeded only when t...

Страница 33: ...ional fees may be charged for the decontamination procedure before service if the decontamination procedure has not been performed or this certificate is not provided Check the following contents The...

Страница 34: ...ce Request Form Product AccuLoader Multi Well Sample Loader Catalog No A 5251 Serial No Date of Request Date of Purchase Problem Date Part Description Remark Customer Address Department Name Contact P...

Страница 35: ...h Clean contamination shield cover Clean cartridge heating block Check spill pad of the opening Check cable connection Check initialization location Check Bluetooth connection Check barcode scanner Af...

Страница 36: ...bioneer com www bioneer com 155FilbertSt Suite216Oakland CA94607 USA 1 877 264 4300 Toll free 1 510 865 0350 order usa bioneer com us bioneer com KoreaBioParkBldg B 702 700Daewangpangyo ro Bundang gu...

Отзывы: