27
6 Operating Instruction
6.1 Experimental Process
Step 1: Check before power-on
↓
Step 2: Power-on
↓
Step 3: Preparation before experiment
↓
Step 4: Standard experimental procedure
↓
Step 5: Experiment closed
↓
Step 6: Disinfection
↓
Step 7: Shutdown
6.2 Check Before Power-on
Be sure to check the instrument carefully before operation.
Caution
Please make sure that the power cord connected to the instrument is properly
connected and can provide a stable voltage.
Personnel without professional training are prohibited from operating the
instrument.
6.3 Power-on
1. Turn on the main power switch on the left panel of the instrument.
2. Click the software icon to log into the main interface of the software.
3. The system will automatically perform the initialization detection.
Figure 6-2 Main power switch
Caution
Main power switch of the instrument, as shown in Figure 6-2. Ship switch "
Ⅰ
" means power on and the indicator light is on. "O" means power off.
6.4 Preparation Before Experiment
1. Sample processing shall be carried out according to the instructions of the virus