background image

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание HighStrengthFAST 1.0

Страница 1: ...ervice Manual For use with MicroFAST 0 5 0 625 0 75 0 9 1 5 3 0 4 5 9 0 MyFAST 1 0 HighStrengthFAST 1 0 1 5 3 0 4 5 9 0 NitriFAST 0 5 0 625 0 75 0 9 1 5 3 0 4 5 9 0 Service Manual FASTSM 001 REV 30 JU...

Страница 2: ...2...

Страница 3: ...SLUDGE DEPTH 8 TANK PUMPING PROCEDURE 9 SEASONAL INTERMITTENT USE 9 BLOWER REPLACEMENT 10 Blower Removal 10 Blower Installation 11 CLEANING THE BLOWER FILTER 11 Blower Filter Removal 11 Blower Filter...

Страница 4: ...ulate in the bottom of the tank for periodic removal The FAST assembly consists of two components the treatment module and blower The blower provides air to the system via the air supply pipe The air...

Страница 5: ...he septic tank for easy cleanout 3 REMOTE MOUNTED BLOWER The blower must be set in a dry stable place and its elevation must be higher than the normal flood level A two piece rectangular housing is in...

Страница 6: ...NSTALLATION OPTION LID INSTALLATION OPTION Only available for model sizes 0 5 through 3 0 on all FAST systems NOTE These images show equipment that is not supplied by BioMicrobics See Installation Man...

Страница 7: ...amaging substances into the FAST system may void the warranty For list of prohibited or limited use substances see the Owner s Manual NORMAL OPERATING CONDITIONS SOUND The FAST system s blower makes a...

Страница 8: ...bris Clean by using built in plunger WATER QUALITY Effluent should be clear and odorless All FAST systems are capable of exceeding the USEPA standard for secondary wastewater treatment 40CFR part 133...

Страница 9: ...solids so they can be effectively pumped out of the tank 4 Once the unit has been pumped out immediately refill the tank with clean water to reduce the risk of the tank floating and to minimize the i...

Страница 10: ...odily injury or death 2 Remove blower housing cover by unscrewing the mounting bolts and lifting the lid off the blower housing base 3 Remove the motor conduit box cover on the blower motor by unscrew...

Страница 11: ...ower using the correct scheme as noted on the inside of the motor conduit box cover 7 Insulate the wires and fit them inside the conduit box in a professional manner 8 Attach the conduit box cover to...

Страница 12: ...ng service prior to performing any work All electrical work shall be properly performed by a qualified electrician per all applicable codes Failure to do so may result in severe bodily injury or death...

Страница 13: ...n FAST tank The FAST tank is flooded Determine cause of flooding e g line obstruction lateral field pump failure high flows etc Blower motor is making a loud whining or grinding noise Blower motor bea...

Страница 14: ...of labor and all other expenses resulting from replacement of the defective parts and from installation of parts furnished under this warranty shall be borne by the owner This warranty does not cover...

Страница 15: ...ial Number ________________________ System Designer Name _____________________________ Designer Phone ___________________________________ Installed By ______________________________________ Installer...

Страница 16: ...nother bottle C Dissolved oxygen DO and pH meters may be used If you use them they must be calibrated at the site using the manufacturer s required techniques D A sludge measurement device such as a S...

Страница 17: ...es place the collection container into the stream of effluent and rinse any collection containers including sample bottles that will contain effluent DO NOT rinse TKN and ammonia sample bottles that c...

Страница 18: ...ture in the logbook along with the date address and time K Take the sample bottles and place them into the cooler with the wet ice The bottles should be well covered by the ice in order to facilitate...

Отзывы: