19
4
MAINTENANCE
SCHEDULED SERVICE CHECKS
Daily/Weekly Service Checks
Perform the daily and weekly service checks listed in Table 4-1.
Table 4-1.
Daily/Weekly Service Checks
Service Check
Daily
before use
Weekly
Check that all upper and lower control box controls
work properly.
Check for hydraulic oil leaks.
Check for loose or missing parts.
Check for and retighten loose nuts and bolts.
Check that cage gate is secure.
Ensure Operation Manual is in manual tube.
Verify that underguard shuts down operation when
weight is applied.
Содержание ESP 19
Страница 1: ......
Страница 18: ...18 ...
Страница 42: ...42 Figure 4 17 Electrical Layout ...
Страница 43: ...43 Figure 4 18 Drive Wiring Diagrams ...
Страница 44: ...44 Figure 4 18 Drive Wiring Diagrams 2 ...
Страница 45: ...45 Figure 4 19 Upper Control Wiring Diagram ...
Страница 46: ...46 ...
Страница 49: ...49 Figure 5 1 Decal Locations Side View ...
Страница 51: ...51 APPENDIX A PART LISTS ...
Страница 58: ...58 FOURTH MOVING MAST PLATFORM 7 8 6 5 2 4 3 1 15 14 13 9 16 Chain from 2 Mast nd 17 11 10 12 18 19 19 21 20 ...
Страница 68: ...68 DRIVE AXLE 16 17 15 12 11 10 14 13 9 8 7 5 4 6B 6 6A 6C 1 2 3 ...
Страница 78: ...78 HYDRAULIC CYLINDER FITTINGS AND HOSES 1 9 10 11 12 13 14 15 14 8 5 4 3 2 6 7 16 17 ...
Страница 80: ...80 ...
Страница 82: ...82 EUCLID MOTOR FACE MOUNT ...
Страница 84: ...84 EUCLID MOTOR FLANGE MOUNT ...
Страница 86: ...86 ASI MOTOR MOUNT ...
Страница 88: ...88 STEERING ASSEMBLY I ...
Страница 90: ...90 STEERING ASSEMBLY II ...
Страница 91: ...91 STEERING ASSEMBLY II PARTS LIST Item No Part No Description Qty 1 B07 08 0037 Knuckle Tie Rod 4 ...
Страница 92: ...92 ...
Страница 93: ...93 ...
Страница 94: ...94 ...
Страница 95: ...95 ...
Страница 96: ...96 ...